共 50 条
- [42] A Sampling Approach for Proactive Project Scheduling under Generalized Time-dependent Workability Uncertainty JOURNAL OF ARTIFICIAL INTELLIGENCE RESEARCH, 2019, 64 : 385 - 427
- [44] Uncertainty Quantification of Time-Dependent Reliability Analysis in the Presence of Parametric Uncertainty ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART B-MECHANICAL ENGINEERING, 2016, 2 (03):
- [48] Novel decoupling method for time-dependent reliability-based design optimization Structural and Multidisciplinary Optimization, 2020, 61 : 507 - 524