共 50 条
- [31] The design of room and pillar mining systems in the UK 17TH INTERNATIONAL CONFERENCE ON GROUND CONTROL IN MINING, PROCEEDINGS, 1998, : 138 - 146
- [32] Mechanism of disaster induced by dynamic instability of coal pillar group in room-and-pillar mining of shallow and close coal seams Meitan Xuebao/Journal of the China Coal Society, 2019, 44 (02): : 358 - 366
- [33] Ventilation systems of room and pillar mining method Meitan Xuebao/Journal of China Coal Society, 2001, 26 (01):
- [34] Geomechanical safety aspects in hard rocks mining based on room-and-pillar and longwall mining systems MINEFILL 2020-2021, 2021, : 288 - 304
- [35] Optimality Analysis of Pillar Dimensions in Room and Pillar Mining PROCEEDINGS OF THE 4TH INTERNATIONAL SYMPOSIUM ON MINE SAFETY (2012), 2012, : 85 - 87
- [36] Arc-shaped bulkhead applied in short-wall room-and-pillar mining Electronic Journal of Geotechnical Engineering, 2014, 19 (Z6): : 17617 - 17625
- [37] CLASSIFICATION OF PROTECTIVE PILLARS TOWARD HIGHER SAFETY AND INNOVATION IN ROOM-AND-PILLAR COAL MINING EURASIAN MINING, 2020, (02): : 24 - 27
- [38] Applicable Conditions of Room-and-Pillar Mining Goaf Treatment Methods under a Traffic Load APPLIED SCIENCES-BASEL, 2023, 13 (03):
- [39] IMMEDIATE ROOF STABILITY ANALYSIS FOR NEW ROOM-AND-PILLAR MINING TECHNOLOGY IN "ESTONIA" MINE ENVIRONMENT, TECHNOLOGY, RESOURCES, PROCEEDINGS, 2005, : 262 - 269