Rock behavior during underground cavern excavation

被引:0
|
作者
Yoshida, T [1 ]
Hirakawa, Y [1 ]
Mori, S [1 ]
机构
[1] Kansai Elect Power Co Inc, Osaka, Japan
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Various kinds of measurements were carried out during large underground cavern excavation to elucidate rock behavior as a discontinuous material. As a result, rock behavior was estimated in detail, such as characteristics of rack propagation, displacement and stress redistribution. A particular discontinuity was recognized to have much influence to the behavior. Then, a simulation by employing discrete element method considering the discontinuity was carried out, and the result showed the same trend as the observed behavior. Biaxial shearing tests using block specimens were also carried out to study the influence of the initial discontinuities to the rock behavior.
引用
收藏
页码:1039 / 1044
页数:6
相关论文
共 50 条
  • [41] Rock behaviour during excavation of large scale cavern and proposal of lining design concept
    Hibino, Satoshi
    Motojima, Mutsumi
    Doboku Gakkai Rombun-Hokokushu/Proceedings of the Japan Society of Civil Engineers, 1993, (481 pt 3-25): : 125 - 134
  • [42] Monitoring of Ground Behavior During the Excavation of an Underground Ramp
    Hasan, Grant
    Afshani, Alireza
    Akagi, Hirokazu
    Endou, Keiichiro
    INFORMATION TECHNOLOGY IN GEO-ENGINEERING, 2020, : 718 - 729
  • [43] Underground cavern excavation using underground bulk explosives-an Indian case study
    Mishra, A. K.
    Rao, K. V. Ramana
    Rao, B. Eswara
    Joshi, Deepak
    PERFORMANCE OF EXPLOSIVES AND NEW DEVELOPMENTS, 2013, : 91 - 96
  • [44] Study on Fine Classification of Surrounding Rock during Construction Stage of Underground Cavern with Layered Rock Mass
    Fan C.-T.
    Liang Q.-G.
    Yue J.-P.
    Zhou C.-G.
    Jia G.-Y.
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2023, 36 (04): : 169 - 182
  • [45] Application of block theory in underground cavern rock stability
    Zhang, QH
    Wu, AQ
    Ding, XL
    DEVELOPMENT AND APPLICATION OF DISCONTINUOUS MODELLING FOR ROCK ENGINEERING, 2003, : 207 - 212
  • [46] Underground cavern development in the Jurong sedimentary rock formation
    Zhao, J
    Liu, Q
    Lee, KW
    Choa, V
    Teh, CI
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1999, 14 (04) : 449 - 459
  • [47] RELIABILITY ASSESSMENT OF UNDERGROUND ROCK CAVERN LIMIT STATES
    Zhang, Wengang
    Goh, Anthony Teck Chee
    ADVANCES IN UNDERGROUND SPACE DEVELOPMENT, 2013, : 1106 - 1111
  • [48] Geological and geotechnical approach for excavation of large unlined rock cavern
    Singh, D.
    Mandal, A.
    Usmani, A.
    Nanda, A.
    CURRENT SCIENCE, 2018, 115 (04): : 638 - 643
  • [49] Three-Dimensional Dynamic Analysis on Different Excavation of Underground Cavern
    Yu, De-hai
    Jiang, An-nan
    Wang, Jun-xiang
    2011 INTERNATIONAL CONFERENCE ON FUTURE COMPUTERS IN EDUCATION (ICFCE 2011), VOL I, 2011, : 332 - 335
  • [50] Behavior of discontinuties during excavation of two large underground caverns
    Yoshida, T.
    Ohnishi, Y.
    Nishiyama, S.
    Hirakawa, Y.
    Mori, S.
    International Journal of Rock Mechanics and Mining Sciences, 2004, 41 (SUPPL. 1) : 1 - 6