Structural Assessment of Concrete Cable-Stayed Bridge after Replacement of Closure Segment: The Service Stage

被引:7
|
作者
Li, Hongjiang [1 ]
机构
[1] Minist Transport, Res Inst Highway, 8 Xitucheng Rd, Beijing 100088, Peoples R China
关键词
Cable stayed bridges;
D O I
10.1061/(ASCE)SC.1943-5576.0000508
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
To deal with failure in the closure segment in an existing concrete cable-stayed bridge, a new strengthening method, called the replacement of closure segment (RCS), has emerged in recent years in China. Basically, the construction process of RCS includes removing the failed closure segment, then constructing a new one, and finally improving the connection between the new closure segment and the original and residual part of the main girder by some strengthening measures. To assess the concrete cable-stayed bridge strengthened by RCS, a field loading test was implemented, and several structural indexes were investigated, including deflection of the bridge deck, horizontal displacement of pylons, concrete stress of critical sections in the main girder, and natural vibration characteristics. The results show that the concrete cable-stayed bridge after RCS behaves very well. The measured values of these structural indexes are very consistent with the analytical ones and tend to be safer. Thus, the strength and stiffness of the bridge structure after RCS can satisfy the load-carrying capacity and serviceability requirements specified in its original design. RCS opens up a new way and provides a beneficial exploration for strengthening existing concrete cable-stayed bridges during their use lifetime.
引用
收藏
页数:10
相关论文
共 50 条
  • [12] The concrete cable-stayed Helgeland bridge in Norway
    Svensson, HS
    Jordet, E
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1996, 114 (02) : 54 - 63
  • [13] Structural response of a concrete cable-stayed bridge under thermal loads
    Tome, Emanuel Sousa
    Pimentel, Mario
    Figueiras, Joaquim
    ENGINEERING STRUCTURES, 2018, 176 : 652 - 672
  • [14] Technologies on Replacement of Structural Members in Prestressed Concrete Cable-stayed Bridges
    Li, Hong Jiang
    TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 1158 - 1166
  • [15] Online structural monitoring of a cable-stayed bridge
    Chang, SP
    Kim, SK
    SMART SYSTEMS FOR BRIDGES, STRUCTURES, AND HIGHWAYS: SMART STRUCTURES AND MATERIALS 1996, 1996, 2719 : 150 - 158
  • [16] RECONSTRUCTION OF THE CLOSURE SEGMENT OF MAIN SPAN IN EXISTING PRESTRESSED CONCRETE CABLE-STAYED BRIDGES
    Li, Hongjiang
    Zhang, Jinquan
    Li, Wanheng
    Wu, Hanliang
    PROCEEDINGS OF THE TWELFTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOLS I AND II, 2012, : 539 - 545
  • [17] The Structural Form and Development of Cable-Stayed Bridge
    Yu, BaoChu
    Wang, JiaSong
    Ai, Jie
    Sun, RongYang
    PROCEEDINGS OF THE 2017 2ND INTERNATIONAL CONFERENCE ON ADVANCES IN MATERIALS, MECHATRONICS AND CIVIL ENGINEERING (ICAMMCE 2017), 2017, 121 : 61 - 64
  • [18] Design of Cable Replacement of a Combined Cable-Stayed and Suspension Pipeline Bridge
    Gao, Hong-Bo
    Ding, Zhi-Kai
    Bridge Construction, 2017, 47 (02) : 95 - 99
  • [19] Monitoring calculation of closure change of Extradosed Cable-stayed Bridge
    Shi, Jing Xian
    Ran, Zhi Hong
    2018 4TH INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING (ICEMEE 2018), 2018, 38
  • [20] Second Dolsan Bridge: A Cable-Stayed Bridge with a Concrete Edge Girder
    Park, Dae Yong
    Lee, Bo Be
    STRUCTURAL ENGINEERING INTERNATIONAL, 2012, 22 (01) : 44 - 48