The impact of applying effort to reduce activity variability on the project time and cost performance

被引:27
|
作者
Martens, Annelies [1 ]
Vanhoucke, Mario [1 ,2 ,3 ]
机构
[1] Univ Ghent, Fac Econ & Business Adm, Tweekerkenstr 2, B-9000 Ghent, Belgium
[2] Vlerick Business Sch, Technol & Operat Management, Reep 1, B-9000 Ghent, Belgium
[3] UCL, UCL Sch Management, 1 Canada Sq, London E14 5AA, England
关键词
Project management; Schedule control; Corrective actions; Simulation; EARNED VALUE MANAGEMENT; ACTIVITY SENSITIVITY; UNCERTAINTY; INFORMATION; DURATION;
D O I
10.1016/j.ejor.2019.03.020
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
During project execution, deviations from the baseline schedule are inevitable due to the presence of uncertainty and variability. To assure successful project completion, the project's progress should be monitored and corrective actions should be taken to get the project back on track. This paper presents an integrated project control procedure for measuring the project's progress and taking corrective actions when necessary. We apply corrective actions that reduce the activity variability to improve the project outcome. Therefore, we quantify the relation between the applied managerial effort and the reduction in activity variability. Moreover, we define three distinct control strategies to take corrective actions on activities, i.e. an interventive strategy, a preventive strategy and a hybrid strategy. A computational experiment is conducted to evaluate the performance of these strategies. The results of this experiment show that different strategies are preferred depending on the topological network structure of projects. More specifically, the interventive strategy and hybrid strategy are preferred for parallel projects, while the preventive strategy is preferred for serial projects. (C) 2019 Elsevier B.V. All rights reserved.
引用
收藏
页码:442 / 453
页数:12
相关论文
共 50 条
  • [21] A stochastic model and algorithms for determining efficient time-cost tradeoffs for a project activity
    Godinho, Pedro
    Costa, Joao Paulo
    OPERATIONAL RESEARCH, 2020, 20 (01) : 319 - 348
  • [22] The impact of client characteristics on the time and cost performance of collaborative infrastructure projects
    Manley, Karen
    Chen, Le
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2016, 23 (04) : 511 - 532
  • [23] An association rule mining method for estimating the impact of project management policies on software quality, development time and effort
    Moreno Garcia, Maria N.
    Ramos Roman, Isabel
    Garcia Penalvo, Francisco J.
    Toro Bonilla, Miguel
    EXPERT SYSTEMS WITH APPLICATIONS, 2008, 34 (01) : 522 - 529
  • [24] Integrating machine learning and network analytics to model project cost, time and quality performance
    Uddin, Shahadat
    Ong, Stephen
    Lu, Haohui
    Matous, Petr
    PRODUCTION PLANNING & CONTROL, 2024, 35 (12) : 1475 - 1489
  • [25] Data exploration on factors that influences construction cost and time performance on construction project sites
    Amusan, Lekan M.
    Afolabi, Adedeji
    Ojelabi, Raphael
    Omuh, Ignatius
    Okagbue, Hilary, I
    DATA IN BRIEF, 2018, 17 : 1320 - 1325
  • [26] The impact of unequal processing time variability on reliable and unreliable merging line performance
    Romero-Silva, Rodrigo
    Shaaban, Sabry
    Marsillac, Erika
    Laarraf, Zouhair
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2021, 235
  • [27] Modeling stochastic project time-cost trade-offs with time-dependent activity durations
    Ke, Hua
    Ma, Weimin
    Chen, Xiaowei
    APPLIED MATHEMATICS AND COMPUTATION, 2012, 218 (18) : 9462 - 9469
  • [28] The impact of unequal processing time variability on reliable and unreliable merging line performance
    Romero-Silva, Rodrigo
    Shaaban, Sabry
    Marsillac, Erika
    Laarraf, Zouhair
    International Journal of Production Economics, 2021, 235
  • [29] Redesign Effect on the Time Performance and Cost Performance Project Design and Build House in Chinatown Kelapa Gading Jakarta
    Dinariana, Dwi
    Yohana, Yuki
    3RD INTERNATIONAL CONFERENCE ON CONSTRUCTION AND BUILDING ENGINEERING (ICONBUILD 2017), 2017, 1903
  • [30] Impact of Time on Performance on the Weekly Calendar Planning Activity (WCPA)
    Marks, Timothy
    Everson, Vanessa
    Leighton, Meaghan
    Manor, Shelby
    Palomar, Lionel
    Rivas, Guadalupe
    Al-Heizan, Muhammad
    Edwards, Dorothy Farrar
    AMERICAN JOURNAL OF OCCUPATIONAL THERAPY, 2020, 74 (04):