Optimal Operation Control for Multiple BESSs of a Large-Scale Customer Under Time-Based Pricing

被引:31
|
作者
Kim, Seul-Ki [1 ]
Kim, Jong-Yul [1 ]
Cho, Kyeong-Hee [1 ]
Byeon, Gilsung [1 ]
机构
[1] Korea Electrotechnol Res Inst, Smart Distribut Res Ctr, Chang Won 641120, South Korea
关键词
BESS; EMS; load management; optimal scheduling; real-time dispatch; time based pricing; MODEL-PREDICTIVE CONTROL; ENERGY-STORAGE; MANAGEMENT; SYSTEM;
D O I
10.1109/TPWRS.2017.2696571
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents an online optimal operation framework for multiple battery energy storage systems (BESSs) of a large-scale customer under time-based pricing. Many publications have been reported on optimal battery operation techniques but most of them were analyzed in a simulation environment or a specifically designed test bed. However, this paper focuses on implementing the proposed scheme into actual multiple battery storage units and investigating the performance during long-term field operation. The operation framework consists of two levels: optimal scheduling and real-time dispatch. The optimal scheduling is calculated every hour, using a model predictive control based nonlinear optimization model, to minimize the daily electricity usage cost while regulating the peak. The real-time dispatch determines final commands to multiple battery systems by monitoring the system state and checking for any violations of the operation constraints. The two-level control scheme was designed to handle uncertainty in forecast load and estimated state-of-charge levels of batteries. The operation method was applied into the energy management system supervising one lithium-polymer BESS and two lead-acid BESSs of an industrial site. Comprehensive field operation results prove the reliability and effectiveness of the optimal operation framework.
引用
收藏
页码:803 / 816
页数:14
相关论文
共 50 条
  • [21] Distributed Real-Time Pricing Control for Large-Scale Unidirectional V2G With Multiple Energy Suppliers
    Rahbari-Asr, Navid
    Chow, Mo-Yuen
    Chen, Jiming
    Deng, Ruilong
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2016, 12 (05) : 1953 - 1962
  • [22] Optimal factory operation planning using electrical load shifting under time-based electric rates
    Park, Jaeil
    Park, SeJoon
    Ok, Changsoo
    JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2016, 10 (06):
  • [23] An SQP-based multiple shooting algorithm for large-scale PDE-constrained optimal control problems
    Fang, Liang
    Vandewalle, Stefan
    Meyers, Johan
    JOURNAL OF COMPUTATIONAL PHYSICS, 2023, 477
  • [24] Optimal maintenance strategy for large-scale production systems under maintenance time uncertainty
    Jin, Haibo
    Song, Xianhe
    Xia, Hao
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2023, 240
  • [25] Continuous Time-Based Operation Method for Energy Storage under Large Penetration Level of Renewable Energy
    Li, Feng
    Zhang, Yinya
    Xi, Jianghui
    Yan, Mingyu
    2024 6TH ASIA ENERGY AND ELECTRICAL ENGINEERING SYMPOSIUM, AEEES 2024, 2024, : 829 - 834
  • [26] Time-based electricity pricing for large-volume customers: A comparison of two buildings under tariff alternatives
    Yalcintas, Melek
    Hagen, William T.
    Kaya, Abidin
    UTILITIES POLICY, 2015, 37 : 58 - 68
  • [27] Localized LQG Optimal Control for Large-Scale Systems
    Wang, Yuh-Shyang
    Matni, Nikolai
    2016 AMERICAN CONTROL CONFERENCE (ACC), 2016, : 1954 - 1961
  • [28] Adaptive Optimal Control for Large-Scale Nonlinear Systems
    Michailidis, Iakovos
    Baldi, Simone
    Kosmatopoulos, Elias B.
    Ioannou, Petros A.
    IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 2017, 62 (11) : 5567 - 5577
  • [29] Optimal Control for Precision Irrigation of a Large-Scale Plantation
    Kassing, Ruud
    De Schutter, Bart
    Abraham, Edo
    WATER RESOURCES RESEARCH, 2020, 56 (10)
  • [30] DECOMPOSITION OF LARGE-SCALE STOCHASTIC OPTIMAL CONTROL PROBLEMS
    Barty, Kengy
    Carpentier, Pierre
    Girardeau, Pierre
    RAIRO-OPERATIONS RESEARCH, 2010, 44 (03) : 167 - 183