An interactive algorithm for multi-objective flow shop scheduling with fuzzy processing time through resolution method and TOPSIS

被引:15
|
作者
Nakhaeinejad, Mahdi [1 ]
Nahavandi, Nasim [1 ]
机构
[1] Tarbiat Modares Univ, Dept Ind Engn, Tehran, Iran
关键词
Flow shop scheduling; TOPSIS; Fuzzy processing time; Makespan; Mean flow time; Machine idle time; PARTICLE SWARM OPTIMIZATION; GENETIC ALGORITHM; EARLINESS; CRITERIA;
D O I
10.1007/s00170-012-4388-5
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper develops a method for solving a multi-objective flow shop scheduling in a fuzzy environment where processing times are fuzzy numbers. The objective functions are designed to simultaneously minimize the makespan (completion time), the mean flow time, and the machine idle time. For each objective function, a fuzzy subset in the decision space whose membership function represents the balance between feasibility degree of constraints and satisfaction degree of the goal is defined. Then, technique for order preference by similarity to an ideal solution (TOPSIS) method finds the nondominated solution in a multiple objective state. The TOPSIS method and the interactive resolution method are integrated in the proposed method to solve the multi-objective flow shop scheduling problem. One of the new contributions of this research is combining these two methods in solving this problem. The proposed algorithm provides a way to find a crisp solution for the fuzzy flow shop scheduling in a multi-objective state. Also, the proposed method yields a reasonable solution that represents the balance between the feasibility of a decision vector and the optimality for an objective function by the interactive participation of the decision maker in all steps of decision process. Application of the proposed method to flow shop scheduling is shown with two numerical examples. The results show that the algorithm could be applied for determining the most preferable sequence by finding a nondominated solution for different degrees of satisfaction of constraints, and with regard to objective value, where processing time is fuzzy.
引用
收藏
页码:1047 / 1064
页数:18
相关论文
共 50 条
  • [31] A multi-objective genetic algorithm for fuzzy flexible job-shop scheduling problem
    Wang, Xiaojuan
    Gao, Liang
    Zhang, Chaoyong
    Li, Xinyu
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2012, 45 (2-3) : 115 - 125
  • [32] A cooperative coevolution algorithm for multi-objective fuzzy distributed hybrid flow shop
    Zheng, Jie
    Wang, Ling
    Wang, Jing-jing
    KNOWLEDGE-BASED SYSTEMS, 2020, 194
  • [33] Multi-objective flow shop group scheduling with separable setup time and handling time
    Kong, Jili
    Yuan, Chunhui
    Yang, Fuxing
    Jia, Guozhu
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (10): : 2694 - 2703
  • [34] No-wait flow shop scheduling using fuzzy multi-objective linear programming
    Javadi, Babak
    Saidi-Mehrabad, M.
    Haji, Alireza
    Mahdavi, Iraj
    Jolai, F.
    Mahdavi-Amiri, N.
    JOURNAL OF THE FRANKLIN INSTITUTE-ENGINEERING AND APPLIED MATHEMATICS, 2008, 345 (05): : 452 - 467
  • [35] Multi-objective optimization with fuzzy measures and its application to flow-shop scheduling
    Giannopoulos, Nikos
    Moulianitis, Vasilis C.
    Nearchou, Andreas C.
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2012, 25 (07) : 1381 - 1394
  • [36] Application of fuzzy multi-objective linear programming to no-wait flow shop scheduling
    Haji, Alireza
    Javadi, Babak
    Alipour, Kaveh Fallah
    RECENT PROGRESS IN COMPUTATIONAL SCIENCES AND ENGINEERING, VOLS 7A AND 7B, 2006, 7A-B : 192 - 194
  • [37] A Hybrid Algorithm for Multi-Objective Optimization of Minimizing Makespan and Total Flow Time in Permutation Flow Shop Scheduling Problems
    Robert, R. B. Jeen
    Rajkumar, R.
    INFORMATION TECHNOLOGY AND CONTROL, 2019, 48 (01): : 47 - 57
  • [38] A Novel Multi-objective Particle Swarm Optimization Algorithm for Flow Shop Scheduling Problems
    Wang, Wanliang
    Chen, Lili
    Jie, Jing
    Zhao, Yanwei
    Zhang, Jing
    ADVANCED INTELLIGENT COMPUTING THEORIES AND APPLICATIONS: WITH ASPECTS OF ARTIFICIAL INTELLIGENCE, 2012, 6839 : 24 - +
  • [39] Multi-objective collaborative sine optimization algorithm for the distributed flow-shop scheduling
    Lang J.
    Gu X.-S.
    Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2024, 41 (06): : 1029 - 1037
  • [40] Multi-Objective Flexible Flow Shop Scheduling Problem Considering Variable Processing Time due to Renewable Energy
    Wu, Xiuli
    Shen, Xianli
    Cui, Qi
    SUSTAINABILITY, 2018, 10 (03):