The Optimization of Printed Circuit Board Assembly Scheduling for a large parallel system

被引:0
|
作者
Jin, Zhihong [1 ]
Liu, Ying [1 ]
Jing, Shaoying [1 ]
机构
[1] Dalian Maritime Univ, Coll Transportat Management, Dalian, Peoples R China
关键词
large parallel system; printed circuit board; scheduling; optimization;
D O I
10.1109/SOLI.2008.4682985
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper discusses the optimization of printed circuit board (PCB) assembly scheduling for a large parallel system, JUKI FX-1, which is known as the most complicated PCB assembly machines. This whole problem is formulated and divided into nozzle allocation, feeder arrangement and component placement sequence three sub-problems. By analyzing the characteristics of the solutions, three heuristic algorithms, cluster analysis, sequence traversal, and assignation of built-in pick-and-place set, for solving the three sub-problems are designed, respectively. Then they are organically integrated according to their internal interrelation. The integrated algorithm was implemented on real life problems, and contrastive results showed that the proposed scheduling algorithm is more efficient than the software built-in JUKI FX-1.
引用
收藏
页码:2651 / 2655
页数:5
相关论文
共 50 条
  • [41] The processing time optimization of printed circuit board
    Ancau, Mircea
    CIRCUIT WORLD, 2009, 35 (03) : 21 - 28
  • [42] The component retrieval problem in printed circuit board assembly
    Crama, Y
    Flippo, OE
    VandeKlundert, J
    Spieksma, FCR
    INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 1996, 8 (04): : 287 - 312
  • [43] Balancing printed circuit board assembly line systems
    Lapierre, SD
    Debargis, L
    Soumis, F
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (16) : 3899 - 3911
  • [44] GROUPING METHODS FOR PRINTED-CIRCUIT BOARD ASSEMBLY
    MAIMON, O
    SHTUB, A
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (07) : 1379 - 1390
  • [45] Component Grouping for Automatic Printed Circuit Board Assembly
    M. T. Sze
    P. Ji
    W. B. Lee
    The International Journal of Advanced Manufacturing Technology, 2002, 19 : 71 - 77
  • [46] Job release policy and printed circuit board assembly
    Magazine, MJ
    Polak, GG
    IIE TRANSACTIONS, 2003, 35 (04) : 379 - 387
  • [47] Component grouping for automatic printed circuit board assembly
    Sze, MT
    Ji, P
    Lee, WB
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2002, 19 (01): : 71 - 77
  • [48] Component grouping for automatic printed circuit board assembly
    Ji, P. (mfpji@polyu.edu.hk), 1600, Springer-Verlag London Ltd (19):
  • [49] Intelligent simulation environment for printed circuit board assembly
    Ali, SA
    De Souza, R
    Kumar, A
    JOURNAL OF ELECTRONICS MANUFACTURING, 1999, 9 (04): : 299 - 311
  • [50] A comparison of setup strategies for printed circuit board assembly
    Leon, VJ
    Peters, BA
    COMPUTERS & INDUSTRIAL ENGINEERING, 1998, 34 (01) : 219 - 234