Coordinating order acceptance and integrated production-distribution scheduling with batch delivery considering Third Party Logistics distribution

被引:55
|
作者
Noroozi, Amir [1 ]
Mazdeh, Mohammad Mandavi [1 ]
Heydari, Mehdi [1 ]
Rasti-Barzoki, Morteza [2 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
[2] Isfahan Univ Technol, Dept Ind & Syst Engn, Esfahan 8415683111, Iran
关键词
Batch delivery; Order acceptance; Integrated production-Distribution; Third-Party logistics; Genetic algorithm; Local search; DUE-DATE ASSIGNMENT; MINIMIZING MAXIMUM TARDINESS; TOTAL NET REVENUE; SINGLE-MACHINE; SUPPLY CHAIN; GENETIC ALGORITHM; BOUND ALGORITHM; TARDY JOBS; TRANSPORTATION; PARALLEL;
D O I
10.1016/j.jmsy.2017.11.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The present study proposes two mixed integer linear programming model for two important aspects of integrated production-distribution scheduling: order acceptance and batch direct delivery. Moreover, as many companies are unable to provide sufficient transportation facilities to deliver the customer orders due to high costs of initial investment, transportation is outsourced to a third-party logistics provider in which the transportation cost is dependent on the batch. The aim of this paper is trading off among the revenue of accepted orders, costs of delivery, and penalties for tardiness incurred in an integrated production-distribution in a supply chain to maximize the total of benefit. In addition, since the problem in this study is strongly NP-hard, an adaptive genetic algorithm is used to solve large-scale instances in this regard that use the adaptive search approach. A representation procedure is introduced based on two optimal properties of the problem. For the initial population, four heuristics are developed. To explore and locate the algorithm in a better neighborhood, a local search is made use of. Taguchi experimental design was applied to set the appropriate parameters of the algorithms. Moreover, to verify the developed model and evaluate the performance of algorithm against the exact solution, a commercial solver is used. The obtained results on generated random instances reveal the appropriate performance of heuristics, the adaptive approach and local search on the genetic algorithm. Furthermore, the effect of different parameters and factors of the proposed model on the profit shows that the order acceptance and the more vehicles of the company improve the profit. (C) 2017 The Society of Manufacturing Engineers. Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:29 / 45
页数:17
相关论文
共 38 条
  • [21] New exact and approximation algorithms for integrated production and transportation scheduling with committed delivery due dates and order acceptance
    Li, Feng
    Xu, Shifu
    Xu, Zhou
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 306 (01) : 127 - 140
  • [22] On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time
    Ng, C. T.
    Lu, Lingfa
    JOURNAL OF SCHEDULING, 2012, 15 (03) : 391 - 398
  • [23] On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time
    C. T. Ng
    Lingfa Lu
    Journal of Scheduling, 2012, 15 : 391 - 398
  • [24] Integrated Production and Distribution Problem of Perishable Products with a Minimum Total Order Weighted Delivery Time
    Liu, Ling
    Liu, Sen
    MATHEMATICS, 2020, 8 (02)
  • [25] Integrated production and distribution scheduling problems related with fixed delivery departure dates and number of late orders
    Li, Shanlin
    Li, Maoqin
    JOURNAL OF INEQUALITIES AND APPLICATIONS, 2014,
  • [26] Integrated production and distribution scheduling problems related with fixed delivery departure dates and number of late orders
    Shanlin Li
    Maoqin Li
    Journal of Inequalities and Applications, 2014
  • [27] Design of a two-echelon freight distribution system in an urban area considering third-party logistics and loading-unloading zones
    Yu, Vincent F.
    Winarno
    Lin, Shih-Wei
    Gunawan, Aldy
    APPLIED SOFT COMPUTING, 2020, 97
  • [28] Integrated Order Batching and Distribution Scheduling in a Single-block Order Picking Warehouse Considering S-Shape Routing Policy
    Mehrjerdi, Y. Zare
    Alipour, M.
    Mostafaeipour, A.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2018, 31 (10): : 1723 - 1733
  • [29] A monolithic batch-centric MILP approach for a real-world integrated production and pipeline distribution scheduling problem
    Sidki, Mouad
    Tchernev, Nikolay
    Fenies, Pierre
    Ren, Libo
    Elfirdoussi, Selwa
    COMPUTERS & INDUSTRIAL ENGINEERING, 2025, 203
  • [30] Simultaneous Lot-sizing and Scheduling for Single-stage Multi-product Production-distribution System with Due Date Considerations to Minimize Total Logistics Cost
    Wang, Deyun
    Luo, Hongyuan
    2016 8TH INTERNATIONAL CONFERENCE ON INTELLIGENT HUMAN-MACHINE SYSTEMS AND CYBERNETICS (IHMSC), VOL. 1, 2016, : 200 - 203