A Novel Two-Stage Method for Collaboratively Scheduling of Steel Production and Energy in Steelmaking and Continuous Casting Processes

被引:0
|
作者
Li, Ting [1 ,2 ]
Lv, Zhimin [2 ]
机构
[1] Beijing Jinghang Res Inst Comp & Commun, Beijing, Peoples R China
[2] Univ Sci & Technol Beijing, Natl Engn Res Ctr Adv Rolling, Beijing, Peoples R China
来源
2019 IEEE 6TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA) | 2019年
基金
中国国家自然科学基金;
关键词
steelmaking and continuous casting; scheduling; a two-stage method;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Taking account of time dependent electricity prices, this paper proposes discrete-time Resource Task Network (RTN) formulations to deal with collaborative scheduling of steel production and energy in steelmaking and continuous casting (SCC) problem. Due to complexity and difficulty of a large-scale SCC problem, a novel two stage method with different scheduling units is proposed to solve the model faster and more effective. The numeric experiments show that the two-stage method is very efficient and practical in the realistic steel and iron enterprises.
引用
收藏
页码:54 / 58
页数:5
相关论文
共 50 条
  • [31] A novel Lagrangian relaxation level approach for scheduling steelmaking-refining-continuous casting production
    Xin-fu Pang
    Liang Gao
    Quan-ke Pan
    Wei-hua Tian
    Sheng-ping Yu
    Journal of Central South University, 2017, 24 : 467 - 477
  • [32] A novel Lagrangian relaxation level approach for scheduling steelmaking-refining-continuous casting production
    Pang Xin-fu
    Gao Liang
    Pan Quan-ke
    Tian Wei-hua
    Yu Sheng-ping
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2017, 24 (02) : 467 - 477
  • [33] Intelligent Optimization Scheduling of Steelmaking and Continuous Casting Production and Its Application
    Wang, Xiu-ying
    Chai, Tian-you
    Zheng, Bing-lin
    Yu, Sheng-ping
    Luo, Xiao-chuan
    2010 8TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2010, : 288 - 294
  • [34] Research on production scheduling for steelmaking and continuous casting with processing time uncertainty
    Yu, Sheng-Ping
    Pang, Xin-Fu
    Chai, Tian-You
    Zheng, Bing-Lin
    Kongzhi yu Juece/Control and Decision, 2009, 24 (10): : 1467 - 1472
  • [35] An intelligent scheduling system for steelmaking and continuous casting complex production process
    Wang, X. Y.
    Su, B. R.
    Chai, T. Y.
    DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES B-APPLICATIONS & ALGORITHMS, 2006, 13E : 3751 - 3756
  • [36] A mathematical programming model for scheduling steelmaking-continuous casting production
    Tang, LX
    Liu, JY
    Rong, AY
    Yang, ZH
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 120 (02) : 423 - 435
  • [37] Dynamic Scheduling System for Steelmaking-Refining-Continuous Casting Production
    Pang, Xin-fu
    Jiang, Ying-chun
    Gao, Liang
    Tang, Bo
    Li, Hai-bo
    Yu, Sheng-ping
    Liu, Wei
    2017 29TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2017, : 4710 - 4715
  • [38] An Effective Subgradient Method for Scheduling a Steelmaking-Continuous Casting Process
    Mao, Kun
    Pan, Quan-Ke
    Chai, Tianyou
    Luh, Peter B.
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2015, 12 (03) : 1140 - 1152
  • [39] Hybrid intelligent scheduling method and its application for steelmaking and continuous casting
    Research Center of Automation, Northeastern University, Shenyang 110004, China
    不详
    Hua Dong Li Gong Da Xue/J East China Univ Sci Technol, 2006, 7 (844-848):
  • [40] A novel hybrid algorithm for scheduling steel-making continuous casting production
    Atighehchian, Arezoo
    Bijari, Mehdi
    Tarkesh, Hamed
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (08) : 2450 - 2461