Incorporating ergonomics into the concurrent engineering of a new warehouse

被引:4
|
作者
Parker, M
机构
[1] Hewlett-Packard Company, Microwave Instruments Division, Rohnert Park, CA 94928
关键词
ergonomics; concurrent engineering; warehouse; solution mapping;
D O I
10.1016/S0169-8141(96)00058-3
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
At Hewlett-Packard's Microwave Instruments Division (HP MID) we are aggressively working toward incorporating ergonomics into the new product and new process development cycle. The inclusion of an ergonomics engineer on a development project's concurrrnt engineering team is an essential part of meeting this goal. This paper presents the methodology used to integrate ergonomics into the concurrent engineering of a new 100,000 square foot warehouse and highlights the key issues encountered.
引用
收藏
页码:251 / 257
页数:7
相关论文
共 50 条
  • [41] Concurrent engineering
    Integr. Comput. Aided Eng., 2008, 1 (01):
  • [42] CONCURRENT ENGINEERING
    SCHWAB, AJ
    SCHILLI, B
    ZINSER, K
    IEEE SPECTRUM, 1993, 30 (09) : 56 - 60
  • [43] Concurrent engineering
    Hoerbst, E.
    Jahn, S.
    Wozny, M.
    Chown, W.
    Siewiorek, D.
    Broy, M.
    Proceedings of the IFIP World Computer Congress, 1992, 1
  • [44] Concurrent engineering
    Smith, JL
    AEROSPACE ENGINEERING, 1998, 18 (08) : 32 - 35
  • [45] CONCURRENT ENGINEERING
    COSTELLO, J
    COMPUTER DESIGN, 1991, 30 (01): : 21 - 23
  • [46] Concurrent engineering
    Young, Bob
    International Journal of Production Research, 1995, 33 (09):
  • [47] CONCURRENT ENGINEERING
    ROSENBLATT, A
    WATSON, GF
    IEEE SPECTRUM, 1991, 28 (07) : 22 - 22
  • [48] Concurrent engineering
    不详
    CONTROL AND INSTRUMENTATION, 2000, 32 (09): : 11 - 11
  • [49] Concurrent engineering
    Trego, L
    AEROSPACE ENGINEERING, 1996, 16 (11) : 4 - 4
  • [50] CONCURRENT ENGINEERING
    OWEN, JV
    MANUFACTURING ENGINEERING, 1992, 109 (05): : 69 - 73