Disassembly and Reassembly Sequence Planning Tradeoffs Under Uncertainty for Product Maintenance

被引:29
|
作者
Behdad, Sara [1 ]
Thurston, Deborah [1 ]
机构
[1] Univ Illinois, Ind & Enterprise Syst Engn Dept, Urbana, IL 61801 USA
基金
美国国家科学基金会;
关键词
INTEGRATED APPROACH; OPTIMIZATION; METHODOLOGY; PARTS;
D O I
10.1115/1.4006262
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The problem addressed in this paper is disassembly sequence planning for the purposes of maintenance or component upgrading, which is an integral part of the remanufacturing process. This involves disassembly, component repair or replacement, and reassembly. Each of these steps incurs cost as well as the probability of damage during the process. This paper presents a method for addressing these tradeoffs, as well as the uncertainty associated with them. A procedure for identifying the best sequence of disassembly operations for maintenance and/or component upgrade is presented. It considers both disassembly and reassembly costs and uncertainties. Graph-based integer linear programming combined with multi-attribute utility analysis is employed to identify the best set of tradeoffs among (a) disassembly time (and resulting cost) under uncertainty, (b) the probability of not incurring damage during disassembly, (c) reassembly time (and resulting cost), and (d) the probability of not incurring damage during reassembly. An example of a solar heating system is used to illustrate the method. [DOI: 10.1115/1.4006262]
引用
收藏
页数:9
相关论文
共 50 条
  • [21] Disassembly sequence planning for products with defective parts in product recovery
    Gungor, A
    Gupta, SM
    COMPUTERS & INDUSTRIAL ENGINEERING, 1998, 35 (1-2) : 161 - 164
  • [22] Complex product disassembly sequence planning oriented to defective parts
    Song, Xiao-Wen
    Pan, Xing-Xing
    Feng, Kun
    Zhou, Wei-Dong
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2013, 19 (06): : 1249 - 1255
  • [23] Product disassembly sequence planning based on ant colony optimization
    College of Mechanical Science and Engineering, Huazhong University of Science and Technology, Wuhan 430074, China
    Jisuanji Fuzhu Sheji Yu Tuxingxue Xuebao, 2007, 3 (387-391+397):
  • [24] 3D-DSPNET: PRODUCT DISASSEMBLY SEQUENCE PLANNING
    Upadhyay, Abhinav
    Ladrecha, Bharat
    Dubey, Alpana
    Kuriakose, Suma Mani
    Goenka, Piyush
    2022 IEEE INTERNATIONAL CONFERENCE ON MULTIMEDIA AND EXPO WORKSHOPS (IEEE ICMEW 2022), 2022,
  • [25] Product disassembly sequence planning based on ant colony algorithm
    Wang, Hui
    Xiang, Dong
    Duan, Guang-Hong
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2006, 12 (09): : 1431 - 1437
  • [26] Disassembly sequence planning approach for product virtual maintenance based on improved max-min ant system
    Liu, Xinhua
    Peng, Gaoliang
    Liu, Xiumei
    Hou, Youfu
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 59 (5-8): : 829 - 839
  • [28] A graph-based disassembly sequence planning for EOL product recycling
    Zhang, HC
    Kuo, TC
    TWENTY FIRST IEEE/CPMT INTERNATIONAL ELECTRONICS MANUFACTURING TECHNOLOGY SYMPOSIUM, 1997, : 140 - 151
  • [29] Product cooperative disassembly sequence and task planning based on genetic algorithm
    Tian, Yongting
    Zhang, Xiufen
    Liu, Zehua
    Jiang, Xingyue
    Xue, Junfang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2019, 105 (5-6): : 2103 - 2120
  • [30] Product cooperative disassembly sequence and task planning based on genetic algorithm
    Yongting Tian
    Xiufen Zhang
    Zehua Liu
    Xingyue Jiang
    Junfang Xue
    The International Journal of Advanced Manufacturing Technology, 2019, 105 : 2103 - 2120