共 50 条
- [43] BOF blowing process challenges for high rate of iron ore pellet addition - Process development and results at Ternium Brasil Iron and Steel Technology, 2018, 15 (04): : 44 - 49
- [44] Numerical simulation and parameters optimisation of direct reduction process of iron ore-carbon composite pellet TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION C-MINERAL PROCESSING AND EXTRACTIVE METALLURGY, 2015, 124 (01): : 27 - 34
- [45] DYNAMIC MATHEMATICAL MODEL OF THE COMPLETE GRATE/KILN IRON-ORE PELLET INDURATION PROCESS. Metallurgical transactions. B, Process metallurgy, 1988, 19 B (01): : 103 - 112
- [46] A Combined Beneficiation Process to Recover Iron Minerals from a Finely Disseminated Low-Grade Iron Ore ADVANCES IN CHEMICAL, MATERIAL AND METALLURGICAL ENGINEERING, PTS 1-5, 2013, 634-638 : 3273 - 3276
- [47] A DYNAMIC MATHEMATICAL-MODEL OF THE COMPLETE GRATE KILN IRON-ORE PELLET INDURATION PROCESS METALLURGICAL TRANSACTIONS B-PROCESS METALLURGY, 1988, 19 (01): : 103 - 112
- [49] Ore-Proportioning Optimization Technology in Pellet Process Based on Self-characteristics of Iron Ores ADVANCES IN METALLURGICAL AND MINING ENGINEERING, 2012, 402 : 183 - +
- [50] Improvement of production process at Golgohar iron ore complex based on beneficiation studies Amirkabir (Journal of Science and Technology), 11 (42): : 216 - 224