Seismic dynamic response study of Wuhan Changjiang River tunnel

被引:0
|
作者
Dong Bichang [1 ]
Shu Taolang [1 ]
机构
[1] Wuhan Univ Technol, Sch Transportat, Wuhan 430063, Peoples R China
来源
PROGRESS IN STRUCTURE, PTS 1-4 | 2012年 / 166-169卷
关键词
seismic dynamic response; cross-river tunnel; lining; node displacement; equivalent stress;
D O I
10.4028/www.scientific.net/AMM.166-169.2243
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents seismic dynamic response rules of Wuhan Changjiang River tunnel. Bilateral seismic dynamic responses of tunnel typical geology section are studied based on software of ANSYS. Conditions of gravity and water pressure are considered compared with that of no gravity. Some conclusions have been obtained:(1)The node displacement of lining arch crown is the biggest,which of soffit lining is the least under two-way earthquake. The maximal node displacement not considering initial condition of gravity decreases 34 percent, and the relative displacement reduces 22 percent between the top and the bottom of lining compared with thinking of gravity influence; (2) The maximal equivalent node stress of the former distributes on lining side wall, which decreases 29.4 percent in comparison with the latter under two-direction earthquake;(3) The gravity factor can not be ignored in seismic analysis of underground tunnel.
引用
收藏
页码:2243 / 2247
页数:5
相关论文
共 50 条
  • [31] Study on Dynamic Response Characteristics of Slope with Double-Arch Tunnel Under Seismic Action
    Jiang, Xueliang
    Liu, Wenjie
    Yang, Hui
    Zhang, Jiqi
    Yu, Lei
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2021, 39 (02) : 1349 - 1363
  • [32] Construction Techniques for Stiffening Girder of Main Bridge of Yangsigang Changjiang River Bridge in Wuhan
    Li, Lu-Ping
    Li, Xing-Hua
    Luo, Rui-Hua
    Bridge Construction, 2019, 49 (06): : 7 - 12
  • [33] Installation and Traction Techniques for Stay Cables of Qingshan Changjiang River Highway Bridge in Wuhan
    Wang, Zhi-Gang
    Qin, Yong-Xi
    Zhou, Qiang-Sheng
    Yao, Yong-Feng
    Jiang, Hua
    Bridge Construction, 2020, 50 : 133 - 138
  • [34] Safety Risk Evaluation for Qingshan Changjiang River Highway Bridge in Wuhan in Construction Stage
    武汉青山长江公路大桥施工阶段安全风险评估
    1600, Wuhan Bridge Research Institute (50): : 38 - 43
  • [36] Environment Settlements on Embankment in Wuhan Yangtze River Tunnel Construction
    Ding Lieyun
    Li Weiming
    Zhou Guanghui
    Wu Xianguo
    ENVIRONMENT MATERIALS AND ENVIRONMENT MANAGEMENT PTS 1-3, 2010, 113-116 : 985 - 988
  • [37] Dynamic centrifuge tests on seismic response of tunnel in saturated sandy foundation
    Liu Guang-lei
    Song Er-xiang
    Liu Hua-bei
    Gong Cheng-lin
    ROCK AND SOIL MECHANICS, 2008, 29 (08) : 2070 - 2076
  • [38] THE EFFECT OF OBLIQUELY INCIDENT SEISMIC WAVE ON DYNAMIC RESPONSE OF SEA TUNNEL
    Ouyang, Zhiyong
    Cui, Jie
    Lu, Yaobo
    Li, Yadong
    Fundamental Research in Structural Engineering: Retrospective and Prospective, Vols 1 and 2, 2016, : 1601 - 1607
  • [39] Seismic Dynamic Response Analysis Method of Tunnel Considering Coseismic Dislocation
    Feng, Jun
    Zhao, Boming
    Wang, Zijun
    ROCK MECHANICS AND ROCK ENGINEERING, 2025,
  • [40] Seismic Dynamic Response Analysis of Urban Underground Utility Tunnel Structure
    Wang P.-Y.
    Wang S.-H.
    Zhu C.-J.
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2019, 40 (07): : 1020 - 1027