Auxiliary tool allocation in flexible manufacturing systems

被引:13
|
作者
Atan, TS [1 ]
Pandit, R [1 ]
机构
[1] IOWA STATE UNIV SCI & TECHNOL,AMES,IA 50011
关键词
allocation; planning; lagrange multipliers; optimization; manufacturing industries;
D O I
10.1016/0377-2217(94)00061-1
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper analyses a new approach to the machine loading problem arising in flexible manufacturing systems (FMSs). This approach allows the operations to be assigned to machines assuming that machines have access to all the tools required for their operations. This exploits the flexibility of the FMS completely. Next an allocation of tools to machines is determined which satisfies the tool requirements for each machine and minimizes the total number of tools. Thus this approach minimizes the unnecessary tool duplications in the system and maximizes the tool utilization. The problem is modeled as an integer linear program (ILP). We notice that the main problem has a block diagonal structure which is decomposable by relaxing a set of linking constraints. Each separated sub-problem represents a problem of allocation of a single type of tools. We develop a branch-and-bound based exact solution procedure and three heuristic procedures to solve the sub-problems. Our lower bounding approach uses Lagrangean relaxation. The solutions to the Lagrangean relaxation are further used to determine the branching sequences and to develop heuristic approaches. Since finding even a feasible solution to the main problem is NP-hard, we develop only enumerative procedures to solve the main problem. Finally, these solution procedures are tested on randomly generated test problems.
引用
收藏
页码:642 / 659
页数:18
相关论文
共 50 条
  • [21] The tool transporter movements problem in flexible manufacturing systems
    Karzan, Fatma Kilinc
    Azizoglu, Meral
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (11) : 3059 - 3084
  • [22] MULTIPERIOD TOOL AND PRODUCTION ASSIGNMENT IN FLEXIBLE MANUFACTURING SYSTEMS
    SODHI, MS
    ASKIN, RG
    SEN, S
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (06) : 1281 - 1294
  • [23] Tool-provisioning strategies for flexible manufacturing systems
    DeSouza, R
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 1997, 13 (01) : 31 - 39
  • [24] CONTROL RULES FOR TOOL SHARING IN FLEXIBLE MANUFACTURING SYSTEMS
    KASHYAP, AS
    KHATOR, SK
    COMPUTERS & INDUSTRIAL ENGINEERING, 1993, 25 (1-4) : 507 - 510
  • [25] Inspection allocation in flexible manufacturing
    Lee, Jim
    Irion, Robert
    Raz, Tzvi
    Manufacturing review, 1994, 7 (02): : 164 - 171
  • [26] Minimizing the number of tool switching instants in Flexible Manufacturing Systems
    Konak, Abdullah
    Kulturel-Konak, Sadan
    Azizoglu, Meral
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 116 (02) : 298 - 307
  • [27] HEURISTIC ALGORITHM FOR THE TOOL MOVEMENT POLICY IN FLEXIBLE MANUFACTURING SYSTEMS
    SONG, CY
    HWANG, H
    KIM, YD
    JOURNAL OF MANUFACTURING SYSTEMS, 1995, 14 (03) : 160 - 168
  • [28] A visualized cutting tool management pattern for flexible manufacturing systems
    Wang, Guoxin
    Yan, Yan
    Nakajima, Hidehito
    Zhang, Xiang
    Li, Hairui
    2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 1925 - +
  • [29] A dynamic tool requirement planning model for flexible manufacturing systems
    Kumar, A
    Mohamed, Z
    Motwani, J
    Youssef, M
    INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 1997, 9 (04): : 307 - 342
  • [30] A queueing network model for flexible manufacturing systems with tool management
    Tetzlaff, UAW
    IIE TRANSACTIONS, 1996, 28 (04) : 309 - 317