共 50 条
- [22] BASIC PRINCIPLES OF LABOR PRODUCTIVITY GROWTH-FACTORS MANAGEMENT BRANCH SYSTEM CREATION KHIMICHESKAYA PROMYSHLENNOST, 1982, (03): : 184 - 187
- [25] Prerequisites for the Creation of Energy-Conserving Constructions of Tubular Belt Conveyors Refractories and Industrial Ceramics, 2017, 57 : 462 - 466
- [26] GENERAL-ASPECTS AND TECHNICAL PREREQUISITES IN CHOICE OF COMPUTER GASLINI, 1979, 11 (01): : 52 - 54
- [28] Informational early warning platform for tunnel construction Ye, Y. (yeying.bjsz@163.com), 1600, China Railway Southwest Research Institute Co. Ltd., No.97 Gunan Street, West Hi-Tech Zone, Chengdu, 611731, China (50):
- [30] Methods of creation basis decisions of management system construction waste recycling ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1509 - +