Construction Technologies of a Solid-Web Reinforced Concrete Arch Bridge for High-Speed Railway

被引:3
|
作者
Yu, Xiangdong [1 ]
Du, He [1 ]
Jing, Haiquan [1 ]
机构
[1] Cent South Univ, Sch Civil Engn, Changsha, Peoples R China
关键词
High-speed railway bridge; solid-web reinforced concrete arch bridge; finite element method; layer-by-layer construction scheme; bridge-track interaction; BEARING CAPACITY; DESIGN; TRACK;
D O I
10.1080/10168664.2019.1642830
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Muhe Bridge is China's first solid-web reinforced concrete arch high-speed railway bridge. This bridge is located in the hinterland of the Qinling Mountains, Shaanxi Province, where the terrain is complicated. The excavation of the south abutment foundation broke the local rock masses and caused a few unloaded joints. Composite pile foundation and anchor cables combined with shotcrete anchor technology were proposed to strengthen the foundation. The displacements of the foundation before and after the reinforcement were calculated and compared using the finite element method. A layer-by-layer construction scheme was adopted to construct the arch ring because its cross-section was too large. Finally, the additional forces and displacement of the rail tracks were investigated through bridge-track interaction analyses. The effects of long-term shrinkage and creep on the longitudinal stress and displacement of the rail tracks were revealed for different construction schemes. The results provide significant engineering experience for the construction of solid-web reinforced concrete arch bridges.
引用
收藏
页码:280 / 286
页数:7
相关论文
共 50 条
  • [31] The status of Arch Arc in the High-speed electrified railway
    Deng Ming-li
    Ye Qiang
    Wei xin
    Wu Guang-ning
    2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
  • [32] Damage identification for high-speed railway truss arch bridge using fuzzy clustering analysis
    Cao, Bao-Ya
    Ding, You-Liang
    Zhao, Han-Wei
    Song, Yong-Sheng
    STRUCTURAL MONITORING AND MAINTENANCE, 2016, 3 (04): : 315 - 333
  • [33] Developments and Prospects of Long-Span High-Speed Railway Bridge Technologies in China
    Qin, Shunquan
    Gao, Zongyu
    ENGINEERING, 2017, 3 (06) : 787 - 794
  • [34] STUDY ON TEMPERATURE AND CREEP EFFECTFOR HIGH-SPEED RAILWAY PRESTRESSED CONCRETE BEAM BRIDGE
    Lei, Junqing
    Xue, Yuguang
    Xue, Zhaojun
    CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 559 - 564
  • [35] Assessment of an old reinforced concrete open-spandrel arch railway bridge
    Ozakgul, Kadir
    Yilmaz, Mehmet Fatih
    Caglayan, Barlas Ozden
    STRUCTURES, 2022, 44 : 284 - 294
  • [36] Assessment of the use of fiberglass-reinforced foam concrete in high-speed railway bridge approach involving foundation cost comparison
    Liu, Kai-Wen
    Yue, Fei
    Su, Qian
    Zhou, Chuanbin
    Xiong, Zhipeng
    He, Yi
    ADVANCES IN STRUCTURAL ENGINEERING, 2020, 23 (02) : 388 - 396
  • [37] Seismic behaviors of solid-web steel-reinforced-concrete cross-shaped columns
    Zhang, Bo (hope.zb@163.com), 1600, South China University of Technology (42):
  • [38] Research on seismic behavior of solid-web steel reinforced concrete cross-shaped column
    Li, Kai-Wen
    Chen, Xiao
    Li, Zhi-Yang
    Tang, Yu-Hong
    Wang, Wan-Qian
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON MECHANICS AND MECHATRONICS (ICMM 2015), 2016, : 1109 - 1117
  • [39] Model test of cantilever casting construction of reinforced concrete arch bridge
    Li, Xiaobin
    Yang, Yongqing
    Pu, Qianhui
    Liu, Zusheng
    Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2007, 42 (05): : 526 - 530
  • [40] Construction Control Analysis of Large Span Reinforced Concrete Arch Bridge
    Cao, Yu
    Zheng, Yifeng
    Xi, Xiaocong
    MECHATRONICS AND INTELLIGENT MATERIALS II, PTS 1-6, 2012, 490-495 : 1186 - +