Hierarchical production planning model in flexible job shop including a preemption and sequence-dependent setup times

被引:0
|
作者
Osorio Gomes, Juan Carlos [1 ]
Castrillon Montenegro, Oscar Eduardo
Toro Cardona, Juliana Andrea
Orejuela Cabrera, Juan Pablo [1 ]
机构
[1] Univ Valle, Escuela Ingn Ind & Estadist, Cali, Colombia
来源
INGENIERIA E INVESTIGACION | 2008年 / 28卷 / 02期
关键词
hierarchical planning; production programming; pre-emption; sequence-dependent setup time; parallel machines;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Production planning and control are complex problems for manufacturing organisations. Hierarchical production planning and control is one way to address the problem as it con reduce its complexity and reach good solutions in reasonable computational time. This paper presents a hierarchical approach to resolving production programming in a flexible job shop configuration; this problem includes pre-emption and sequence-dependent setup times. Although non-optimal (as expected), good solutions were obtained as shown in the validation of the method.
引用
收藏
页码:72 / 79
页数:8
相关论文
共 50 条
  • [21] A branch and bound method for the job-shop problem with sequence-dependent setup times
    Artigues, Christian
    Feillet, Dominique
    ANNALS OF OPERATIONS RESEARCH, 2008, 159 (01) : 135 - 159
  • [22] Using Genetic Algorithms and Heuristics for Job Shop Scheduling with Sequence-Dependent Setup Times
    Waiman Cheung
    Hong Zhou
    Annals of Operations Research, 2001, 107 : 65 - 81
  • [23] Modeling & solving flexible job shop problem with sequence dependent setup times
    Imanipour, N.
    2006 International Conference on Service Systems and Service Management, Vols 1 and 2, Proceedings, 2006, : 1205 - +
  • [24] Dual resource constrained flexible job shop scheduling with sequence-dependent setup time
    Barak, Sasan
    Javanmard, Shima
    Moghdani, Reza
    EXPERT SYSTEMS, 2024, 41 (10)
  • [25] An integrated preventive maintenance and production planning model with sequence-dependent setup costs and times
    Liu, Xuejuan
    Wang, Wenbin
    Peng, Rui
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2017, 33 (08) : 2451 - 2461
  • [26] An approach for flexible job-shop scheduling with separable sequence-dependent setup time
    Guimaraes, Kairon Freitas
    Fernandes, Marcia Aparecida
    2006 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-6, PROCEEDINGS, 2006, : 3727 - +
  • [27] Solving the flexible job shop scheduling problem with sequence-dependent setup times (vol 265, pg 503, 2018)
    Shen, Liji
    Dauzere-Peres, Stephane
    Neufeld, Janis S.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 296 (02) : 748 - 748
  • [28] A flexible job shop cell scheduling with sequence-dependent family setup times and intercellular transportation times using conic scalarization method
    Deliktas, Derya
    Torkul, Orhan
    Ustun, Ozden
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2019, 26 (06) : 2410 - 2431
  • [29] Flow shop batching and scheduling with sequence-dependent setup times
    Liji Shen
    Jatinder N. D. Gupta
    Udo Buscher
    Journal of Scheduling, 2014, 17 : 353 - 370
  • [30] Flow shop batching and scheduling with sequence-dependent setup times
    Shen, Liji
    Gupta, Jatinder N. D.
    Buscher, Udo
    JOURNAL OF SCHEDULING, 2014, 17 (04) : 353 - 370