OPTIMIZATION BY PRE-ASSIGNMENT OF PROCESSES FOR RE-ENTRANT FLOWSHOP SCHEDULING PROBLEM

被引:0
|
作者
Hino, Rei [1 ]
Osada, Tomoya [1 ]
机构
[1] Nagoya Univ, Grad Sch Engn, Dept Mech Sci & Engn, Chikusa Ku, Nagoya, Aichi 4648603, Japan
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A new optimization procedure for a re-entrant flowshop scheduling problem is proposed to plan a medium sized production schedule by mixed integer programming. Flow time is an index used to evaluate production work-in-process. The flow time is calculated from the total required cycle terms after a feasible schedule is planned. In the present paper, the reverse procedure is performed: the total cycle term is assumed before the scheduling, and the feasible schedule is planned under the assumed terms. The assumption of the total cycle term restricts the pre-assignment of every process into a corresponding cycle term. Therefore some pre-assignments never yield a feasible schedule and are eliminated from the evaluation. Methods for the assumption of the total cycle terms and for the examination of the pre-assignment of the processes are described here. The amount of times required to plan the optimal schedule is evaluated for different sizes of problems in order to validate the proposed procedures.
引用
收藏
页码:333 / 336
页数:4
相关论文
共 50 条
  • [21] A re-entrant hybrid flow shop scheduling problem with machine eligibility constraints
    Zhang, Xiang Yi
    Chen, Lu
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (16) : 5293 - 5305
  • [22] Re-entrant Production Scheduling Problem Under Uncertainty Based On QPSO Algorithm
    Pan, Fengshan
    Ye, Chunming
    Zhou, Jihua
    MECHANICAL, MATERIALS AND MANUFACTURING ENGINEERING, PTS 1-3, 2011, 66-68 : 1061 - 1066
  • [23] Minimizing total tardiness on a two-machine re-entrant flowshop
    Choi, Seong-Woo
    Kim, Yeong-Dae
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 199 (02) : 375 - 384
  • [24] Re-entrant flexible scheduling: Models, algorithms and applications
    Chen, Tong
    Qin, Yuan-Hui
    Wan, Jia-Ning
    Wang, Dong-Jun
    Liu, Bo
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2015, 35 (05): : 1187 - 1201
  • [25] A model for a Special Re-entrant Flow Shop Scheduling
    Cai, Yue
    Wang, Jian
    Li, Hua
    2010 INTERNATIONAL CONFERENCE ON INFORMATION, ELECTRONIC AND COMPUTER SCIENCE, VOLS 1-3, 2010, : 1887 - 1891
  • [26] New heuristic for scheduling re-entrant production lines
    Yalaoui, Naim
    Camara, Mema
    Amodeo, Lionel
    Yalaoui, Farouk
    Mahdi, Halim
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 199 - +
  • [27] Re-entrant hybrid flow shop scheduling problem with continuous batch processing machines
    Wu X.
    Cao Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2022, 28 (11): : 3365 - 3378
  • [28] ON OPTIMIZATION OF A HIGHLY RE-ENTRANT PRODUCTION SYSTEM
    D'Apice, Ciro
    Kogut, Peter I.
    Manzo, Rosanna
    NETWORKS AND HETEROGENEOUS MEDIA, 2016, 11 (03) : 415 - 445
  • [29] Scheduling of Re-entrant Line Based on Swarm Intelligence
    Deng, Ke
    Lin, Jie
    Wang, Feng
    KAM: 2008 INTERNATIONAL SYMPOSIUM ON KNOWLEDGE ACQUISITION AND MODELING, PROCEEDINGS, 2008, : 323 - 328
  • [30] Re-Entrant Green Scheduling Problem of Bearing Production Shops Considering Job Reworking
    Wang, Yansen
    Shi, Jianwei
    Wang, Wenjie
    Li, Cheng
    MACHINES, 2024, 12 (04)