共 50 条
- [42] Risk analysis on flood control operation of reservoir based on stochastic hydrological process Shuili Xuebao, 2006, 2 (227-232):
- [43] Optimized Reservoir Prior Release Operation for Flood Control Considering Operational Weekly Ensemble Hydrological Forecast ADVANCES IN HYDROINFORMATICS: MODELS FOR COMPLEX AND GLOBAL WATER ISSUES-PRACTICES AND EXPECTATIONS, 2022, : 369 - 382
- [45] Two-Stage Method for Reservoir Flood Control with Start-Stop Strategy of Sluice Gate WORLD ENVIRONMENTAL AND WATER RESOURCES CONGRESS 2017: INTERNATIONAL PERSPECTIVES, HISTORY AND HERITAGE, EMERGING TECHNOLOGIES, AND STUDENT PAPERS, 2017, : 664 - 676
- [46] Pre-releasing Strategy Based on Workload Control PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: CORE THEORY AND APPLICATIONS OF INDUSTRIAL ENGINEERING (VOL 1), 2016, : 386 - 397
- [48] A flood mitigation control strategy based on the estimation of hydrographs and volume dispatching IFAC PAPERSONLINE, 2019, 52 (23): : 17 - 22
- [50] Comprehensive risk analysis based on triangular fuzzy number for reservoir flood control operation Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2011, 30 (04): : 30 - 35