Realization of the Railway Electrical Equipment Maintenance Automation System Based on the Workflow and Dynamics

被引:1
|
作者
Li, Gang [1 ]
Ma, YanNing [1 ]
Yang, XiuQian [1 ]
Han, ZhengQing [1 ]
机构
[1] SW Jiaotong Univ, Coll Elect Engn, Chengdu 610031, Peoples R China
来源
关键词
Equipment Maintenance; Process-oriented; Workflow; SMS Alerts for Approval;
D O I
10.4028/www.scientific.net/AMR.460.184
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
For guaranteeing the safety of railway operating, this paper puts forward a new theory of electrical equipment maintenance. Set up uniform data standard and data format, and maintain the electrical equipment information through the computer network; created a new equipment maintenance plan base on the information, and controlled and monitored the situation and completion of maintenance operation; by dint of the workflow mechanism, achieved the normative executing of complicated maintenance flow, and reduced workload; used SMS alerts for approval, and made it convenient to carry out the maintenance plan execution. This method of electrical equipment maintenance can fulfill the demands of electronic, automated and process-orienting.
引用
收藏
页码:184 / 188
页数:5
相关论文
共 50 条
  • [31] Development of compact maintenance system for railway signalling equipment using multiplex system and FFT analysis
    Arai, Hideki
    Takashige, Tetsuo
    Quarterly Report of RTRI (Railway Technical Research Institute) (Japan), 2001, 42 (01): : 10 - 15
  • [32] Fault Detection of Electrical Automation Remote Equipment Based on Data Network
    You, Zhongguo
    Wu, Quancheng
    Zhou, Haizhou
    Ming, Jianqiang
    Boddu, Rajasekhar
    ELECTRICA, 2023, 23 (03): : 458 - 465
  • [33] Structured approach to maintenance and modification of a railway traction IEC 61850 substation automation system
    Hewings, David
    Poczapsky, Andrea
    JOURNAL OF ENGINEERING-JOE, 2018, (15): : 1365 - 1368
  • [34] Substation automation equipment maintenance priority decision based on hesitation fuzzy matrix
    Peng, Xi
    Wang, Jiawen
    Li, Zhenwen
    Cui, Zhuo
    Yang, Xu
    Zhong, Ming
    Li, Long
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2020, 48 (04): : 104 - 109
  • [35] Design and Realization of Office Automation System Based on Digital Campus
    Xu Fei
    Di De-Hai
    Jin Li
    2009 WRI WORLD CONGRESS ON SOFTWARE ENGINEERING, VOL 1, PROCEEDINGS, 2009, : 353 - +
  • [36] Realization of Information Model in a Virtual Maintenance System for Some Missile Launch Guidance Equipment
    Xu Bing
    Zheng Yuan
    Liu Fu-Li
    Wang Han-Bing
    MECHATRONICS ENGINEERING, COMPUTING AND INFORMATION TECHNOLOGY, 2014, 556-562 : 5531 - 5534
  • [38] Corporative Expert - diagnostic and Information System for Control of Electrical Equipment Maintenance
    Davidenko, Irina
    PROCEEDINGS OF THE IVTH INTERNATIONAL SCIENTIFIC SYMPOSIUM ON ELECTRIC POWER ENGINEERING - ELEKTROENERGETIKA 2007, 2007, : 314 - 317
  • [39] NETA MAINTENANCE TESTING RESEARCH ON ELECTRICAL POWER SYSTEM EQUIPMENT PERFORMANCE
    Heid, Kerry
    Widup, Ron
    2011 RECORD OF CONFERENCE PAPERS INDUSTRY APPLICATIONS SOCIETY 58TH ANNUAL IEEE PETROLEUM AND CHEMICAL INDUSTRY CONFERENCE (PCIC), 2011,
  • [40] A mobile e-health system based on workflow automation tools
    Pappas, C
    Coscia, E
    Dodero, G
    Gianuzzi, V
    Earney, M
    PROCEEDINGS OF THE 15TH IEEE SYMPOSIUM ON COMPUTER-BASED MEDICAL SYSTEMS, 2002, : 271 - 276