共 50 条
- [1] Full-Scale Measurements and System Identification on Sutong Cable-Stayed Bridge during Typhoon Fung-Wong SCIENTIFIC WORLD JOURNAL, 2014,
- [2] Nonstationary characteristics of Typhoon Fung-Wong observed at Sutong Bridge site based on SHMS MAINTENANCE, MONITORING, SAFETY, RISK AND RESILIENCE OF BRIDGES AND BRIDGE NETWORKS, 2016, : 255 - 255
- [3] Whole-process measurement of buffeting response of Sutong Bridge under action of Typhoon Haikui Wang, Hao, 1600, Wuhan Bridge Research Institute (44):
- [6] Analysis of influence factors of buffeting response and full-scale aeroelastic experiments for the Xiaoguan Bridge Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2009, 42 (01): : 41 - 48
- [8] Field measurement on buffeting response of Runyang Suspension Bridge under typhoon Matsa Kongqi Donglixue Xuebao, 2008, 3 (296-303):
- [9] Full-scale monitoring of wind and suspension bridge response FIRST CONFERENCE OF COMPUTATIONAL METHODS IN OFFSHORE TECHNOLOGY (COTECH2017), 2017, 276
- [10] Full-Scale Measurements on the Hardanger Bridge During Strong Winds DYNAMICS OF CIVIL STRUCTURES, VOL 2, 2016, : 237 - 245