The Design of Monorail Rolling Stock for Running Performance and Maintenance

被引:0
|
作者
Lee, Woo-Dong [1 ]
机构
[1] Korea Railrd Res Inst, Dept Future Monorail Res, Gyeonggi Do 176, Uiwang, South Korea
关键词
Monorail; Running Performance; Maintenance; Bogie;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Bogie in rolling stock for monorail is very important device to decide performance and function of rolling stock. In monorail rolling stock outside, driving stability is low and increasing the speed in curve section is difficult because vehicle operates with covering up girder of elevated structures. So, transportation ability is lack and passenger evacuation is also difficult when it broke down. Because of these shortcomings, domestic introduction of the monorail is not activated despite advantage that monorail construction cost is very cheap in comparison of light railway. Rolling stock for monorail on the outside installs running wheel to drive on narrow girder, so increasing the speed is difficult. And you should separate the motor in every time replacing the wheel because traction motor is installed on the outside of the wheel. Therefore, bogie structure should be changed in order to improve the speed of vehicle and maintenance and repair efficiency. This study suggested ways to design rolling stock structure for improving driving performance and maintenance and repair efficiency.
引用
收藏
页码:1002 / 1005
页数:4
相关论文
共 50 条
  • [31] Novel Rolling Stock Equipment for the Continuous Train Running Control.
    Kollmannsberger, Florian
    1600, (34):
  • [32] BIG DATA ANALYTICS FOR PROACTIVELY OPTIMIZING ROLLING STOCK MAINTENANCE
    Albakay, Naji
    Hempel, Michael
    Sharif, Hamid
    PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, 2019, 2019,
  • [33] The stochastic maintenance location routing allocation problem for rolling stock
    Tonissen, D. D.
    Arts, J. J.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2020, 230
  • [34] The Application of Genetic Algorithms for the Scheduling of Electric Rolling Stock Maintenance
    Aung, Kyaw Min
    Valentina, Sidorenko
    Vladimir, Buchirin G.
    Anthon, Safronov, I
    PROCEEDINGS OF THE 2019 IEEE CONFERENCE OF RUSSIAN YOUNG RESEARCHERS IN ELECTRICAL AND ELECTRONIC ENGINEERING (EICONRUS), 2019, : 2148 - 2151
  • [35] Investigating maintenance decisions during initial fielding of rolling stock
    Puig, Parada J. E.
    Basten, R. J., I
    van Dongen, L. A. M.
    2ND INTERNATIONAL THROUGH-LIFE ENGINEERING SERVICES CONFERENCE, 2013, 11 : 199 - 203
  • [36] Maintenance of the Electronic Equipment of Paris Metro Rolling Stock.
    Chaumet, Dominique
    Le Clech, Alain
    Revue Generale des Chemins de Fer, 1986, 105 (06): : 371 - 380
  • [37] Driving down the whole life cost of rolling stock maintenance
    Elliott, P
    DEVELOPING AND GROWING THE BUSINESS - PASSENGER: INTERNATIONAL RAILTECH CONGRESS '98, 1998, 1998 (17): : 59 - 66
  • [38] Dynamic fleet maintenance management model applied to rolling stock
    del Castillo, Adolfo Crespo
    Marcos, Jose Antonio
    Parlikad, Ajith Kumar
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2023, 240
  • [39] Maintenance scheduling in rolling stock circulations in rapid transit networks
    Andres, Javier
    Cadarso, Luis
    Marin, Angel
    18TH EURO WORKING GROUP ON TRANSPORTATION, EWGT 2015, 2015, 10 : 524 - 533
  • [40] INDUSTRIAL DESIGN STUDY FOR TGV ROLLING STOCK
    COOPER, J
    FRENCH RAILWAY TECHNIQUES, 1978, (01): : 116 - 120