Brenner Base Tunnel - Construction of the Exploratory Tunnel Non-linear Stochastic Structural Analysis

被引:0
|
作者
Bergmeister, Konrad [1 ]
机构
[1] Univ Nat Resources & Appl Life Sci Vienna, Inst Konstrukt Ingn, A-1190 Vienna, Austria
关键词
D O I
10.1002/best.200800646
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Brenner Base Tunnel runs from the Innsbruck bypass, and from the Innsbruck railway station, to Fortezza/Franzensfeste and is fifty-five kilometres long. Including the Innsbruck bypass, the total length will be sixty-two point eight kilometres, meaning that this will be the longest railway tunnel in the world. It consists of two parallel tunnel tubes with an exploratory tunnel about 12 meters below them. To minimize construction risks, especially in the part to be excavated using a TBM (Tunnel Boring Machine), systematic prospecting and exploration via a tunnel are very important A TBM is currently excavating the ten-kilometer long exploratory tunnel from Aica to Maules. The tunnel will be equipped with thin concrete tubbing rings. Special monitoring equipment will also be installed. The sectional optimization of the tubbing rings, the studies in concrete technology and the appropriate areas for monitoring will be shown.
引用
收藏
页码:658 / 665
页数:8
相关论文
共 50 条
  • [31] Feasibility study for the geothermal exploitation of the Brenner Base Tunnel
    Lanconelli, Matteo
    Voza, Antonio
    Egger, Harald
    Zurlo, Raffaele
    Boldini, Daniela
    Tinti, Francesco
    Ferrari, Marco
    Kasmaee, Sara
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2018, (126): : 35 - 47
  • [32] Material characteristics and compactability of phyllitic tunnel excavation material: Examination of non-recyclable spoil at the Brenner Base tunnel
    Voit K.
    Depiné M.
    Hofmann M.
    Orsi G.
    Murr R.
    Zangerl C.
    Bergmeister K.
    Geomechanik und Tunnelbau, 2021, 14 (04): : 400 - 415
  • [33] A non-linear model of major fire spread in a tunnel
    Beard, AN
    Drysdale, DD
    Bishop, SR
    FIRE SAFETY JOURNAL, 1995, 24 (04) : 333 - 357
  • [34] Innovative TBM transport logistics in construction section H33 of Brenner Base Tunnel
    Innovative Transportlogistik zur TBM-Versorgung im Baulos H33 des Brenner Basistunnels
    Morocutti, Alex (alex.morocutti@pini-partner.com), 1600, Ernst und Sohn (14): : 233 - 244
  • [35] Virtual Technical Visit to the construction sites of BBT (Brenner Base Tunnel) "Isarco Underpass" Lot
    不详
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2021, (138): : 75 - 76
  • [36] Design and Analysis of non-linear Circuit with Tunnel Diode for Hybrid Control Systems
    Pasolli, Philipp
    Ruderman, Michael
    2018 IEEE 15TH INTERNATIONAL WORKSHOP ON ADVANCED MOTION CONTROL (AMC), 2018, : 181 - 186
  • [37] Injection measures at the Brenner Base Tunnel – Challenges for human and equipment
    Voringer, Jürgen
    Hofmann, Matthias
    Knapp, Michael
    Leitner, Stefan
    Morianz, Markus
    Stadler, Philip
    Geomechanik und Tunnelbau, 2024, 17 (06): : 605 - 612
  • [38] Simulation of fire and structural response in the Brenner Base Tunnel by means of a combined approach: A case study
    Bergmeister, Konrad
    Brunello, Pierfrancesco
    Pachera, Matteo
    Pesavento, Francesco
    Schrefler, B. A.
    ENGINEERING STRUCTURES, 2020, 211
  • [39] Validation of longitudinal displacement profiles by measurement at the Brenner Base Tunnel
    Schneider-Muntau B.
    Reinhold C.
    Cordes T.
    Bathaeian I.
    Bergmeister K.
    2018, Ernst und Sohn (11): : 566 - 574
  • [40] Dilatometer tests in deep boreholes in investigation for Brenner base tunnel
    Zalesky, M.
    Buehler, Ch.
    Burger, U.
    John, M.
    UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 283 - +