Identification of run-of-river hydropower investments in data scarce regions using global data

被引:9
|
作者
Magaju, Dipendra [1 ,2 ]
Cattapan, Alessandro [1 ]
Franca, Mario [1 ,3 ]
机构
[1] IHE Delft, Inst Water Educ, Delft, Netherlands
[2] Univ Auckland, Dept Civil & Environm Engn, Auckland, New Zealand
[3] Delft Univ Technol, Dept Hydraul Engn, Delft, Netherlands
关键词
Hydropower potential; Data scarce regions; Hydrological model; Hydropower model; West Rapti basin; FLOW DURATION CURVES; DISTRIBUTIONS; REGIME; PLANTS; MODEL;
D O I
10.1016/j.esd.2020.07.001
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The increase in economic activities, population and rural electrification has significantly increased the energy demand in most of the developing nations. This demand has to be supplied from various sources, preferably renewable, among which hydropower is expected to be one of the major contributors. Though developed nations have already harnessed most of their hydropower potential, developing nations are still struggling in project identification and capacity assessment, mainly due to lack of data and difficulties of access. We present and test an assessment framework, developed for data scarce regions, to identify optimal location and installed capacity of multiple run-of-river hydropower projects within a river basin. The developed framework consists of two components: the first component is a hydrological model for flow duration curves, the second component is a so-called hydropower model. Flow duration curves are obtained using an existing probabilistic hydrological model which derives the probability distribution of streamflow as a function of few topographic and climatic parameters. A novel optimization procedure is developed, where viable hydropower projects are identified minimizing their specific cost, which depends mainly on discharge, head and length of conduit system. We tested the assessment framework in the West Rapti basin (Nepal). The application showed that the total potential of this basin maybe achieved with 79 different projects with capacity ranging from 1 to 17 MW. The framework was developed using open languages and software and can therefore be freely used after request to the corresponding author. (C) 2020 International Energy Initiative. Published by Elsevier Inc. All rights reserved.
引用
收藏
页码:30 / 41
页数:12
相关论文
共 50 条
  • [21] Management strategies for run-of-river hydropower plants: an optimal switching approach
    Olofsson, Marcus
    Onskog, Thomas
    Lundstrom, Niklas L. P.
    OPTIMIZATION AND ENGINEERING, 2022, 23 (03) : 1707 - 1731
  • [22] Run-of-River hydropower and salmonids: potential effects and perspective on future research
    Gibeau, P.
    Connors, B. M.
    Palen, W. J.
    CANADIAN JOURNAL OF FISHERIES AND AQUATIC SCIENCES, 2017, 74 (07) : 1135 - 1149
  • [23] Management strategies for run-of-river hydropower plants: an optimal switching approach
    Marcus Olofsson
    Thomas Önskog
    Niklas L. P. Lundström
    Optimization and Engineering, 2022, 23 : 1707 - 1731
  • [24] Improving frequency containment reserve provision in run-of-river hydropower plants
    Gerini, F.
    Vagnoni, E.
    Cherkaoui, R.
    Paolone, M.
    SUSTAINABLE ENERGY GRIDS & NETWORKS, 2021, 28
  • [25] Optimization of Run-of-River Hydropower Plant Design under Climate Change Conditions
    Parisa Sarzaeim
    Omid Bozorg-Haddad
    Babak Zolghadr-Asli
    Elahe Fallah-Mehdipour
    Hugo A. Loáiciga
    Water Resources Management, 2018, 32 : 3919 - 3934
  • [26] Analysis of implications of a regulation on design discharge of run-of-river hydropower projects in Nepal
    Saroj Babu Bhattarai
    Ram M. Shrestha
    Sustainable Water Resources Management, 2023, 9
  • [27] Optimization of Run-of-River Hydropower Plant Design under Climate Change Conditions
    Sarzaeim, Parisa
    Bozorg-Haddad, Omid
    Zolghadr-Asli, Babak
    Fallah-Mehdipour, Elahe
    Loaiciga, Liugo A.
    WATER RESOURCES MANAGEMENT, 2018, 32 (12) : 3919 - 3934
  • [28] Institutions and processes for scaling up renewables: Run-of-river hydropower in British Columbia
    Jaccard, Mark
    Melton, Noel
    Nyboer, John
    ENERGY POLICY, 2011, 39 (07) : 4042 - 4050
  • [29] Seasonal Hydropower Planning for Data-Scarce Regions Using Multimodel Ensemble Forecasts, Remote Sensing Data, and Stochastic Programming
    Koppa, Akash
    Gebremichael, Mekonnen
    Zambon, Renato C.
    Yeh, William W-G
    Hopson, Thomas M.
    WATER RESOURCES RESEARCH, 2019, 55 (11) : 8583 - 8607
  • [30] Analysis for cost estimation of low head run-of-river small hydropower schemes
    Singal, S. K.
    Saini, R. P.
    Raghuvanshi, C. S.
    ENERGY FOR SUSTAINABLE DEVELOPMENT, 2010, 14 (02) : 117 - 126