Vendor Managed Inventory on Two Echelon Inventory System with Optimum Accelerated Lead Time and Component Commonality

被引:0
|
作者
Hidayat, Y. A. [1 ]
Simatupang, T. [1 ]
Sebrina [1 ]
Ariansyah, M. N. [2 ]
Sembada, W. J. [1 ]
机构
[1] Inst Teknol Bandung, Dept Ind Engn, Bandung, Indonesia
[2] Telkom Univ, Dept Ind Engn, Bandung, Indonesia
关键词
VMI; crashing costs; component commonality; lead time acceleration;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We proposes a model to manage VMI supply chain which has multi items product with certain commonality degree where it facilitates buyer to control the lead time. We present a solution technique to solve VMI supply chain problems by comparing lead time as a parameter and lead time as a decision variable that is possible to be accelerated. Before lead time acceleration is considered, the optimal solutions are obtained simultaneously. On the other sides, we have developed an algorithm for finding solutions when lead time acceleration is allowed. This proposed model is suitable for an organization which implements continuous review on its inventory policy. It can be implemented when the market is monopolistic because back-ordered is allowed and buyer is willing to delay demand fulfilment in order to reduce holding cost.
引用
收藏
页码:1382 / 1386
页数:5
相关论文
共 50 条
  • [21] Time-Based Shipment Consolidation and Stock Replenishment Policy with Lead Time in a Vendor-Managed Inventory System
    Wang Zhengguo
    Liu Huixin
    Xiong Zhiguo
    PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 467 - 472
  • [22] Evolutionary algorithms for optimal operating parameters of vendor managed inventory systems in a two-echelon supply chain
    Sue-Ann, Goh
    Ponnambalam, S. G.
    Jawahar, N.
    ADVANCES IN ENGINEERING SOFTWARE, 2012, 52 : 47 - 54
  • [23] Optimality of Cycle Time and Inventory Decisions in a Two Echelon Inventory System under Credit Period
    Krugon, Seelam
    Nagaraju, Dega
    Narayanan, S.
    12TH GLOBAL CONGRESS ON MANUFACTURING AND MANAGEMENT (GCMM - 2014), 2014, 97 : 2269 - 2278
  • [24] Effects of Yield and Lead-Time Uncertainty on Retailer-Managed and Vendor-Managed Inventory Management
    Lee, Soonkyo
    Kim, Young Joo
    Cheong, Taesu
    Yoo, Seung Ho
    IEEE ACCESS, 2019, 7 : 176051 - 176064
  • [25] Two-echelon supply chain inventory model with controllable lead time
    Vijayashree M.
    Uthayakumar R.
    International Journal of System Assurance Engineering and Management, 2016, 7 (Suppl 1) : 112 - 125
  • [26] Impact of consignment inventory and vendor-managed inventory for a two-party supply chain
    Gumus, Mehmet
    Jewkes, Elizabeth M.
    Bookbinder, James H.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 113 (02) : 502 - 517
  • [27] PERFORMANCE ANALYSIS OF FORECAST DRIVEN VENDOR MANAGED INVENTORY SYSTEM
    Nachiappan, SP.
    Jawahar, N.
    Parthibaraj, S. Calwin
    Brucelee, B.
    JOURNAL OF ADVANCED MANUFACTURING SYSTEMS, 2005, 4 (02) : 209 - 226
  • [28] Stock replenishment policies for a vendor -managed inventory in a retailing system
    Taleizadeh, Ata Allah
    Shokr, Iman
    Konstantaras, Ioannis
    VafaeiNejad, Mahyar
    JOURNAL OF RETAILING AND CONSUMER SERVICES, 2020, 55
  • [29] Switchgear component commonality design method considering delivery lead-time and inventory level
    Kariya, Haruki
    Izui, Kazuhiro
    Nishiwaki, Shinji
    Yoshimura, Masataka
    Ogihara, Yoshiya
    Hayashi, Shuichi
    PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE 2007, VOL 6, PTS A AND B, 2008, : 1039 - 1047
  • [30] A study of supply problem for vendor-managed inventory system
    Tong, LY
    Chen, ZQ
    Yuan, ZZ
    PROCEEDINGS OF 2003 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS I AND II, 2003, : 1024 - 1028