Life cycle cost management of concrete structures relative to chloride-induced reinforcement corrosion

被引:26
|
作者
Cheung, Moe M. S. [1 ]
So, Kevin K. L. [1 ]
Zhang, Xueqing [1 ]
机构
[1] Hong Kong Univ Sci & Technol, Dept Civil & Environm Engn, Clear Water Bay, Hong Kong, Peoples R China
关键词
concrete structure; corrosion; deterioration; life cycle cost management; TIME-DEPENDENT RELIABILITY; PITTING CORROSION; MODEL; PREDICTION; MAINTENANCE; INITIATION; CRACKING; DIFFUSION; STRATEGY; REPAIR;
D O I
10.1080/15732479.2010.507474
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Chloride-induced reinforcement corrosion is one of the major causes for the deterioration of concrete structures. This article has developed a performance-based life cycle cost management (LCCM) model for reinforced concrete structures relative to corrosion deterioration. This model is characterised by three features: (1) a chloride-induced probabilistic corrosion deterioration mechanism is used to predict the service life of concrete structures; (2) the performance of a concrete structure is measured by serviceability limit states and structural capacity limit states; and (3) a dual management methodology is adopted, in which management actions are optimised to maximise the life cycle performance of a concrete structure under limited budget constraints and minimum required serviceability constraints. Case studies of bridge decks and piers are provided to demonstrate the application of the proposed performance-based LCCM model.
引用
收藏
页码:1136 / 1150
页数:15
相关论文
共 50 条
  • [21] Influence of carbonation on chloride-induced reinforcement corrosion in simulated concrete pore solutions
    Liu, Rong
    Jiang, Linhua
    Xu, Jinxia
    Xiong, Chuansheng
    Song, Zijian
    CONSTRUCTION AND BUILDING MATERIALS, 2014, 56 : 16 - 20
  • [22] Effectiveness of concrete surface treatment materials in reducing chloride-induced reinforcement corrosion
    Ibrahim, M
    Al-Gahtani, AS
    Maslehuddin, M
    Almusallam, AA
    CONSTRUCTION AND BUILDING MATERIALS, 1997, 11 (7-8) : 443 - 451
  • [23] Concrete cover cracking with reinforcement corrosion of RC beam during chloride-induced corrosion process
    Zhang, Ruijin
    Castel, Arnaud
    Francois, Raoul
    CEMENT AND CONCRETE RESEARCH, 2010, 40 (03) : 415 - 425
  • [24] CHLORIDE-INDUCED CORROSION OF STEEL IN CONCRETE - INVESTIGATIONS WITH A CONCRETE CORROSION CELL
    SCHIESSL, P
    RAUPACH, M
    LIFE OF STRUCTURES: PHYSICAL TESTING, 1989, : 226 - 233
  • [25] Life cycle embodied energy analysis of RC structures considering chloride-induced corrosion in seismic regions
    Yu, Runqing
    Chen, Li
    Zhang, Diandian
    Wang, Zhenhui
    STRUCTURES, 2020, 25 : 839 - 848
  • [26] Numerical simulation of chloride-induced reinforcement corrosion in cracked concrete based on mesoscopic model
    Chen, Shenggang
    Zhuang, Hongjie
    Zhou, Yu
    Li, Shengyuan
    Li, Chaolai
    CONSTRUCTION AND BUILDING MATERIALS, 2024, 441
  • [28] Forecasting chloride-induced reinforcement corrosion in concrete-effect of realistic reinforcement steel surface conditions
    Angst, U. M.
    Elsener, B.
    CONCRETE REPAIR, REHABILITATION AND RETROFITTING IV, 2016, : 37 - 38
  • [29] Investigation on Chloride-Induced Corrosion Reduction Strategies for Offshore Reinforced Concrete Structures
    Tangtakabi, A.
    Ramesht, M. H.
    Pahlaviani, A. G.
    Pourrostam, T.
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2023, 48 (3) : 1245 - 1260
  • [30] Durability design of concrete structures regarding chloride-induced corrosion by means of nomograms
    Rahimi, A.
    LIFE-CYCLE ANALYSIS AND ASSESSMENT IN CIVIL ENGINEERING: TOWARDS AN INTEGRATED VISION, 2019, : 1301 - 1305