Twinning time and cost in incentive-based contracts

被引:9
|
作者
Jaafari, A
机构
关键词
D O I
10.1061/(ASCE)0742-597X(1996)12:4(62)
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The work presented in this paper focuses on contractual management of projects using a unique risk-management-driven strategy in which the twin variables of time and cost play a fundamental role. To illustrate the conceptual basis of this technique, an example project is presented first. Through the application of the writer's methodology to this project it has been shown how an incentive scheme could be set as the main contractual strategy with significant potential savings in both time and cost. The mean and 90% characteristic value for construction duration and cost, respectively, are estimated by the owner first using the writer's probabilistic forecasting method. These are used to specify an incentive scheme within which the two primary risk variables of time and cost ate managed jointly by the owner and the contractor. Contractual issue's such as owner's tender strategy, contractor's risk assessment, scope variation, and rise and fall adjustment have also been considered briefly.
引用
收藏
页码:62 / 72
页数:11
相关论文
共 50 条
  • [21] Effectiveness and cost of an incentive-based intervention on food safety and income in "dibiteries" in Dakar, Senegal
    Orou Seko, Malik
    Ossebi, Walter
    Houngbedji, Clarisse A.
    Kreppel, Katharina
    Dao, Daouda
    Bonfoh, Bassirou
    BMC PUBLIC HEALTH, 2022, 22 (01)
  • [22] Incentive Contracts, Market Risk, and Cost of Capital
    Bertomeu, Jeremy
    CONTEMPORARY ACCOUNTING RESEARCH, 2015, 32 (04) : 1337 - +
  • [23] Personalized incentive-based peak avoidance and drivers' travel time-savings
    Li, Tianhao
    Chen, Peng
    Tian, Ye
    TRANSPORT POLICY, 2021, 100 : 68 - 80
  • [24] An Incentive-based Evolutionary Algorithm for Participatory Sensing
    Kumrai, Teerawat
    Ota, Kaoru
    Dong, Mianxiong
    Champrasert, Paskorn
    2014 IEEE GLOBAL COMMUNICATIONS CONFERENCE (GLOBECOM 2014), 2014, : 5021 - 5025
  • [25] An agent model for incentive-based production scheduling
    Váncza, J
    Márkus, A
    COMPUTERS IN INDUSTRY, 2000, 43 (02) : 173 - 187
  • [26] Impact of incentive-based programs on supply chains
    Füchtenhans, Marc
    Glock, Christoph H.
    Zeitschrift Kunststofftechnik/Journal of Plastics Technology, 2024, 119 (12): : 890 - 894
  • [27] A dynamic incentive-based argument for conditional transfers
    Mookherjee, Dilip
    Ray, Debraj
    ECONOMIC RECORD, 2008, 84 : S2 - S16
  • [28] Incentive-based search for equilibria in boolean games
    Levit, Vadim
    Komarovsky, Zohar
    Grinshpoun, Tal
    Bazzan, Ana L. C.
    Meisels, Amnon
    CONSTRAINTS, 2019, 24 (3-4) : 288 - 319
  • [29] Incentive-Based Entity Collection using Crowdsourcing
    Chai, Chengliang
    Fan, Ju
    Li, Guoliang
    2018 IEEE 34TH INTERNATIONAL CONFERENCE ON DATA ENGINEERING (ICDE), 2018, : 341 - 352
  • [30] Incentive-based Voltage Regulation in Distribution Networks
    Zhou, Xinyang
    Dall'Anese, Emiliano
    Chen, Lijun
    Baker, Kyri
    2017 AMERICAN CONTROL CONFERENCE (ACC), 2017, : 2732 - 2738