Deterministic vs. probabilistic seismic hazard assessment: An exaggerated and obstructive dichotomy

被引:96
|
作者
Bommer, JJ [1 ]
机构
[1] Univ London Imperial Coll Sci & Technol, Dept Civil & Environm Engn, London SW7 2BU, England
关键词
seismic hazard; probabilistic seismic hazard assessment; deterministic seismic hazard assessment; seismic risk;
D O I
10.1142/S1363246902000644
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Deterministic and probabilistic seismic hazard assessment are frequently represented as irreconcilably different approaches to the problem of calculating earthquake ground motions for design, each method fervently defended by its proponents. This situation often gives the impression that the selection of either a deterministic or a probabilistic approach is the most fundamental choice in performing a seismic hazard assessment. The dichotomy between the two approaches is not as pronounced as often implied and there are many examples of hazard assessments combining elements of both methods. Insistence on the fundamental division between the deterministic and probabilistic approaches is an obstacle to the development of the most appropriate method of assessment in a particular case. It is neither possible nor useful to establish an approach to seismic hazard assessment that will be the ideal tool for all situations. The approach in each study should be chosen according to the nature of the project and also be calibrated to the seismicity of the region under study, including the quantity and quality of the data available to characterise the seismicity. Seismic hazard assessment should continue to evolve, unfettered by almost ideological allegiance to particular approaches, with the understanding of earthquake processes.
引用
收藏
页码:43 / 73
页数:31
相关论文
共 50 条
  • [21] Probabilistic Seismic Hazard Assessment for Taiwan
    Wang, Yu-Ju
    Chan, Chung-Han
    Lee, Ya-Ting
    Ma, Kuo-Fong
    Shyu, J. Bruce H.
    Rau, Ruey-Juin
    Cheng, Chin-Tung
    TERRESTRIAL ATMOSPHERIC AND OCEANIC SCIENCES, 2016, 27 (03): : 325 - 340
  • [22] Probabilistic seismic hazard assessment for Nepal
    Parajuli, H. Ram
    Kiyono, J.
    Taniguchi, H.
    Toki, K.
    Maskey, P. Nath
    RISK ANALYSIS VII: SIMULATION AND HAZARD MITIGATION & BROWNFIELDS V: PREVENTION, ASSESSMENT, REHABILITATION AND DEVELOPMENT OF BROWNFIELD SITES, 2010, : PI405 - PI416
  • [23] PROBABILISTIC SEISMIC HAZARD ASSESSMENT FOR THE NETHERLANDS
    DECROOK, T
    GEOLOGIE EN MIJNBOUW, 1993, 72 (01) : 1 - 13
  • [24] Probabilistic Seismic Hazard Assessment for Japan
    George Ch. Koravos
    Theodoros M. Tsapanos
    M. Bejaichund
    pure and applied geophysics, 2006, 163 : 137 - 151
  • [25] Probabilistic seismic hazard assessment for Thailand
    Ornthammarath, Teraphan
    Warnitchai, Pennung
    Worakanchana, Kawin
    Zaman, Saeed
    Sigbjornsson, Ragnar
    Lai, Carlo Giovanni
    BULLETIN OF EARTHQUAKE ENGINEERING, 2011, 9 (02) : 367 - 394
  • [26] Probabilistic seismic hazard assessment in Albania
    Muco, Betim
    ITALIAN JOURNAL OF GEOSCIENCES, 2013, 132 (02) : 194 - 202
  • [27] Probabilistic Seismic Hazard Assessment of Nepal
    Stevens, V. L.
    Shrestha, S. N.
    Maharjan, D. K.
    BULLETIN OF THE SEISMOLOGICAL SOCIETY OF AMERICA, 2018, 108 (06) : 3488 - 3510
  • [28] Probabilistic seismic hazard assessment for Japan
    Koravos, GC
    Tsapanos, TM
    Bejaichund, M
    PURE AND APPLIED GEOPHYSICS, 2006, 163 (01) : 137 - 151
  • [29] Probabilistic seismic hazard assessment for Thailand
    Teraphan Ornthammarath
    Pennung Warnitchai
    Kawin Worakanchana
    Saeed Zaman
    Ragnar Sigbjörnsson
    Carlo Giovanni Lai
    Bulletin of Earthquake Engineering, 2011, 9 : 367 - 394
  • [30] Deterministic seismic hazard assessment for Sultanate of Oman
    A. Deif
    I. El-Hussain
    K. Al-Jabri
    N. Toksoz
    S. El-Hady
    S. Al-Hashmi
    K. Al-Toubi
    Y. Al-Shijbi
    M. Al-Saifi
    Arabian Journal of Geosciences, 2013, 6 : 4947 - 4960