Analysis and design methodology for an FRP cable-stayed pedestrian bridge

被引:27
|
作者
Khalifa, MA
Hodhod, OA
Zaki, MA
机构
[1] Department of Civil Engineering, University of Nebraska-Lincoln, Lincoln
[2] Cairo University, Giza
关键词
fiber reinforced plastics (FRP); cable-supported bridge; pedestrian bridge; mode shapes; honeycomb; cable-stayed bridge;
D O I
10.1016/1359-8368(95)00016-X
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper describes the various analysis and design aspects of a fiber reinforced plastic (FRP) bridge. The design methodology is illustrated by describing the steps taken in the design of the first US FRP cable-stayed pedestrian bridge to be constructed in Lincoln, Nebraska. The analysis is made using three dimensional (3-D) macro models of the bridge to describe its overall behavior under static and dynamic loads. Separate analysis is done to study the local stability of the different structural elements. The orthotropy of the material is taken into account during this analysis. The short term and long term stiffnesses and strengths are evaluated and accounted for in the design process.
引用
收藏
页码:307 / 317
页数:11
相关论文
共 50 条
  • [31] Innovative cable-stayed bridge
    Christoffersen, Jens
    Jensen, Henrik Elgaard
    Hauge, Lars
    Bjerrum, John
    Concrete (London), 1998, 32 (07): : 32 - 34
  • [32] White City pedestrian Bridge –structural design of the cable-stayed future landmark, Baku (AZ)
    Freymann, Konrad
    ce/papers, 2024, 7 (3-4) : 90 - 93
  • [33] Reliable control design for a cable-stayed bridge benchmark
    Bakule, L
    Paulet-Crainiceanu, F
    Rodellar, J
    PROCEEDINGS OF THE 2003 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2003, : 5040 - 5045
  • [34] Design and construction of a launched cable-stayed bridge in China
    Wang, Yingliang
    Dai, Xiaochun
    He, Tingguo
    Dai, Jianbing
    Zhang, Jiachun
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2019, 172 (05) : 3 - 8
  • [35] Design of a cable-stayed bridge spanning existing railways
    China Railway Major Bridge Reconnaissance & Design Group Co., Ltd., Wuhan
    430056, China
    Bridge Constr., 3 (93-98):
  • [36] DESIGN OF A CABLE-STAYED STEEL COMPOSITE BRIDGE.
    Svensson, Holger S.
    Christopher, Ben G.
    Saul, Reiner
    Journal of structural engineering New York, N.Y., 1986, 112 (03): : 489 - 504
  • [37] Decentralized control design for a cable-stayed bridge benchmark
    Bakule, L
    Paulet-Crainiceanu, F
    Rodellar, J
    PROCEEDINGS OF THE 2002 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2002, 1-6 : 3046 - 3051
  • [38] Analysis of the parameter vibrations of the cable in cable-stayed bridge by FEM
    Wei, Jian-dong
    Yang, You-fa
    Che, Hui-min
    Gong Cheng Li Xue/Engineering Mechanics, 2000, 17 (06): : 130 - 134
  • [39] Bifurcation and Chaotic Analysis for Cable Vibration of a Cable-Stayed Bridge
    Gao, Fabao
    Wang, Ruifang
    Lai, S. K.
    INTERNATIONAL JOURNAL OF STRUCTURAL STABILITY AND DYNAMICS, 2020, 20 (02)
  • [40] Research on scenery design technique for cable-stayed bridge
    Zhang, Changqing
    Wan, Shui
    Zhang, Li
    Nanjing Li Gong Daxue Xuebao/Journal of Nanjing University of Science and Technology, 2002, 26 (03): : 316 - 320