Parametric Performance Study of Tunnel Boring Machine (TBM) In the Titiwangsa Main Range Granite, Malaysia

被引:0
|
作者
Rahim, A. [1 ]
Zabidi, H. [1 ]
Trisugiwo, M. [2 ]
Rafek, A. G. M. [3 ]
机构
[1] Univ Sains Malaysia, Sch Mat & Mineral Resources Engn, Strateg Mineral Niche Grp, Engn Campus, George Town, Malaysia
[2] SNUI JV, PSRWT Project, George Town, Malaysia
[3] Univ Teknol Petronas, Fac Geosci & Petr Engn, Dept Geosci, Bandar Seri Iskandar, Perak, Malaysia
关键词
Tunnel Boring Machine (TBM); tunnelling; Titiwangsa Main Range Granite; water; joint; wear rate;
D O I
10.1016/j.proche.2016.03.143
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper presents a case study on the performances of Tunnel Boring Machine (TBM) opted for the construction of the Interstate Raw Water Transfer (ISRWT) project currently constructed in Selangor-Pahang, Malaysia. The performance of TBM is affected by various properties of rock mass such as the strength of rock, the occurrence of fault zone, the joint orientation and the existence of a water bearing zone. In this project, the 44 km Interstate Raw Water Transfer tunnel is designed to cross solid rock along the alignment with the overburden ranges from just several meters at each portal to more than one thousands meters at the centre of the tunnel. Geology of the alignment comprises of metasedimentary rock at the northern end and granitic rock to the rest of the tunnel. The method used for this study and the evidence are discussed. (C) 2016 The Authors. Published by Elsevier B.V.
引用
收藏
页码:969 / 974
页数:6
相关论文
共 50 条
  • [1] Analysis and assessment of Tunnel Boring Machine (TBM) performance in Korea
    Bae, GJ
    SOIL MECHANICS AND GEOTECHNICAL ENGINEERING, VOL 2, 2001, : 795 - 796
  • [2] Greenfield settlements due to tunnelling using tunnel boring machine (TBM) in layered soils: a parametric study
    Jyoti Agarwal
    Raju Sarkar
    Sādhanā, 49
  • [3] Greenfield settlements due to tunnelling using tunnel boring machine (TBM) in layered soils: a parametric study
    Agarwal, Jyoti
    Sarkar, Raju
    SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2024, 49 (01):
  • [4] Clogging potential of tunnel boring machine (TBM): a review
    Alberto-Hernandez, Yolanda
    Kang, Chao
    Yi, Yaolin
    Bayat, Alireza
    INTERNATIONAL JOURNAL OF GEOTECHNICAL ENGINEERING, 2018, 12 (03) : 316 - 323
  • [5] Supervision and Control System for Tunnel Boring Machine (TBM)
    Chen Ning
    Xu Junmin
    Yuan Bin
    PROCEEDINGS OF THE 27TH CHINESE CONTROL CONFERENCE, VOL 6, 2008, : 600 - 604
  • [6] Evaluation of Hard Rock Tunnel Boring Machine (TBM) Performance Using Stochastic Modeling
    Peyman Jafarshirzad
    Ebrahim Ghasemi
    Saffet Yagiz
    Mohammad Hossein Kadkhodaei
    Geotechnical and Geological Engineering, 2023, 41 : 3513 - 3529
  • [7] Evaluation of Hard Rock Tunnel Boring Machine (TBM) Performance Using Stochastic Modeling
    Jafarshirzad, Peyman
    Ghasemi, Ebrahim
    Yagiz, Saffet
    Kadkhodaei, Mohammad Hossein
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2023, 41 (06) : 3513 - 3529
  • [8] Utilizing Tunnel Boring Machine (TBM)-Crushed Limestone as a Construction Material
    Alnuaim, Ahmed
    Al-Mahbashi, Ahmed M.
    Dafalla, Muawia
    MATERIALS, 2022, 15 (21)
  • [9] Groundwater inflow prediction in urban tunneling with a tunnel boring machine (TBM)
    Font-Capo, Jordi
    Vazquez-Sune, Enric
    Carrera, Jesus
    Marti, David
    Carbonell, Ramon
    Perez-Estaun, Andres
    ENGINEERING GEOLOGY, 2011, 121 (1-2) : 46 - 54
  • [10] Dynamic analysis and vibration reduction of mechanical-hydraulic coupled tunnel boring machine (TBM) main drive system
    Zhang, Zhange
    Ji, Wenbo
    Yang, Bowen
    Huo, Junzhou
    Li, Xuanxuan
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART C-JOURNAL OF MECHANICAL ENGINEERING SCIENCE, 2022, 236 (01) : 115 - 125