共 50 条
- [45] THERMAL POLLUTION OF MURES RIVER BY DISCHARGE OF THE COOLING WATERS FROM MINTIA POWER PLANT GEOCONFERENCE ON ECOLOGY, ECONOMICS, EDUCATION AND LEGISLATION, SGEM 2013, VOL I, 2013, : 1099 - +
- [46] PHYSICAL EXPERIMENTS ON THE DISCHARGE CAPABILITY OF THE SLUICE CAISSON OF TIDAL POWER PLANT PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON APAC 2011, 2012,
- [49] Numerical Modeling of Thermal Discharge of Lamu Power Plant, Kenya ASIAN AND PACIFIC COASTS 2017: PROCEEDINGS OF THE 9TH INTERNATIONAL CONFERENCE ON APAC 2017, 2018, : 894 - 903