Improved Ant Colony Algorithm for Solving Multi-modal Resource Constrained Project Scheduling Problem

被引:0
|
作者
Chen, Jie [1 ]
Hau, Wenqian [1 ]
Dong, Yixi [2 ]
机构
[1] Nanjing Univ Sci & Technol, Sch Econ & Management, Nanjing, Peoples R China
[2] Washington Univ, St Louis, MO USA
关键词
component; multi-mode; resource constraints; project scheduling; ant colony algorithm; adaptive parameters;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Solving the multi-mode resource-constrained project scheduling problem is an NP-hard combinatorial optimization problem with various practical application backgrounds. Aiming at the balance between the ant colony algorithm's convergence speed and the diversity of solutions, this paper proposes an improved ant colony algorithm to solve this problem. The parameter range and change range in the algorithm can be adjusted synchronously and adaptively with the operation of the algorithm. The positive feedback process of the pheromone volatilization factor control algorithm is improved. Simultaneously, the maximum and minimum ant system algorithm and the upper and lower limits of the pheromone are introduced into the ant colony algorithm to optimize the updated strategy of pheromone.
引用
收藏
页码:6 / 11
页数:6
相关论文
共 50 条
  • [21] Improved ACO Algorithm for Resource-Constrained Project Scheduling Problem
    Zhou, Yumiao
    Guo, Qingshun
    Gan, Rongwei
    2009 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND COMPUTATIONAL INTELLIGENCE, VOL III, PROCEEDINGS, 2009, : 358 - 365
  • [22] An improved PSO algorithm for resource-constrained project scheduling problem
    Luo, Xinggang
    Wang, Dingwei
    Tang, Jianfu
    Tu, Yiliu
    WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 3514 - +
  • [23] Solving the resource-constrained multi-project scheduling problem with an improved critical chain method
    Tian, Min
    Liu, Ren Jing
    Zhang, Guang Jun
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2020, 71 (08) : 1243 - 1258
  • [24] Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm
    Liu, Jia
    Liu, Yisheng
    Shi, Ying
    Li, Jian
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2020, 34 (02)
  • [25] Solving Resource-Constrained Project Scheduling Problem Using Metaheuristic Algorithm
    Munlin, Mudarmeen
    2018 5TH INTERNATIONAL CONFERENCE ON ELECTRICAL AND ELECTRONIC ENGINEERING (ICEEE), 2018, : 344 - 349
  • [26] Applying forward/backward scheduling to multi-colony ant algorithm in solving scheduling problem
    Udomsakdigool, Apinanthana
    Kachitvichyanukul, Voratas
    IMECS 2007: INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, VOLS I AND II, 2007, : 2020 - +
  • [27] A genetic algorithm for the resource constrained multi-project scheduling problem
    Goncalves, J. F.
    Mendes, J. J. M.
    Resende, M. G. C.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 1171 - 1190
  • [28] Using an Enhanced Ant Colony System to Solve Resource-Constrained Project Scheduling Problem
    Chen, Ruey-Maw
    Lo, Shih-Tang
    INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2006, 6 (11): : 75 - 84
  • [29] Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling
    Zhang, Hong
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (02) : 150 - 159
  • [30] Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling
    Menesi, Wail
    Hegazy, Tarek
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (03)