Empirical study on building financial Early-warning system for SMEs

被引:0
|
作者
Lin Juan [1 ]
Fang Hui [1 ]
机构
[1] China Univ Geosci, Beijing 100083, Peoples R China
关键词
SME; financial risk; financial Early-warning indicators;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
The thesis is based on how Small and Medium-sized Enterprises(SME) build their financial Early-warning indicators system. So the thesis had studied the foreign and domestic financial Early-warning theories, then it designed out innovative SMEs' Early-warning indicators system that was based on the actions of financial management, and then designed the model of Early-warning that combined the way of Efficiency Coefficient. At last the thesis had empirical study of specific company.
引用
收藏
页码:373 / 378
页数:6
相关论文
共 50 条
  • [41] Establishing the model on the financial statements fraud early-warning
    Tian Xiaolei
    Li Yongchen
    TIRMDCM 2007: PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON TECHNOLOGY INNOVATION, RISK MANAGEMENT AND SUPPLY CHAIN MANAGEMENT, VOLS 1 AND 2, 2007, : 323 - 328
  • [42] Immunity's early-warning system
    O'Neill, LAJ
    SCIENTIFIC AMERICAN, 2005, 292 (01) : 38 - +
  • [43] Early-warning management of inner logistics risk in SMEs based on label-card system
    Xie, Kefan
    Liu, Jieming
    Peng, Huatao
    Chen, Gang
    Chen, Yun
    PRODUCTION PLANNING & CONTROL, 2009, 20 (04) : 306 - 319
  • [44] STUDY ON EARLY-WARNING SYSTEM OF COTTON PRODUCTION IN HEBEI PROVINCE
    Zhang, Runqing
    Ma, Teng
    COMPUTER AND COMPUTING TECHNOLOGIES IN AGRICULTURE II, VOLUME 2, 2009, 295 : 973 - 980
  • [45] Study on risk estimation and early-warning system of insurance company
    Hu Tao
    Zhu Bin
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON RISK ANALYSIS AND CRISIS RESPONSE, 2007, 2 : 228 - 232
  • [46] A warning on early-warning scores!
    Cuthbertson, B. H.
    Smith, G. B.
    BRITISH JOURNAL OF ANAESTHESIA, 2007, 98 (06) : 704 - 706
  • [47] Study of the Early-warning Management System of Marketing Channels Risk
    Ma Ying
    Xie Kefan
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & GLOBAL E-BUSINESS, VOLS I AND II, 2009, : 84 - 89
  • [48] Study on the land desertification early-warning system of Xinjiang in China
    College of educational science, Xinjiang Normal University, Urumqi, China
    Comput. Model. New Technol., 8 (286-291):
  • [49] An Intelligent Financial Early Warning System Model Based on Data Mining for SMEs
    Koyuncugil, Ali Serhan
    Ozgulbas, Nermin
    INTERNATIONAL CONFERENCE ON FUTURE COMPUTER AND COMMUNICATIONS, PROCEEDINGS, 2009, : 662 - +
  • [50] Financial Early-Warning Model Based on Rough sets and SVM
    Li, Zehong
    Yang, Hongwei
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & ENGINEERING MANAGEMENT, VOLS 1 AND 2, 2008, : 688 - 691