OPTIMIZATION OF REMANUFACTURING PRODUCTION SCHEDULING CONSIDERING UNCERTAIN FACTORS

被引:7
|
作者
Zhang, H. P. [1 ]
机构
[1] North China Univ Water Resources & Elect Power, Zhengzhou 450046, Henan, Peoples R China
关键词
Uncertain Factors; Remanufacturing; Production Scheduling; Optimization; Simulation; MODEL; IDENTIFICATION; DECISION;
D O I
10.2507/IJSIMM18(2)CO8
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper attempts to optimize the remanufacturing production scheduling under randomness and fuzziness. Firstly, the rough set theory and multi-objective approximation ranking algorithm were combined into a quality evaluation method of remanufacturing recycling resources, which eliminates the redundant information in quality evaluation. Then, a remanufacturing production scheduling model was constructed under uncertain conditions, and a hybrid algorithm coupling double fuzzy algorithm, backpropagation (BP) neural network and genetic algorithm was developed to solve the model. The simulation results show that the algorithm achieved good convergence and the obtained solution can minimize the total cost of production scheduling and the processing time. This means the model algorithm can effectively optimize the scheduling of remanufacturing production. The research findings shed new light on the fast quality evaluation of recycled resources and the optimization scheduling of remanufacturing production.
引用
收藏
页码:344 / 354
页数:11
相关论文
共 50 条
  • [31] Joint scheduling optimization of production assembly considering testing groups in robot manufacturing
    Wu, Peng
    Kong, Min
    Zhang, Han
    Fathollahi-Fard, Amir M.
    Yaseen, Zaher Mundher
    ANNALS OF OPERATIONS RESEARCH, 2024,
  • [32] Integrated batch production planning and scheduling optimization considering processing time uncertainty
    Gao, Jingxing
    Guo, Ziqing
    Liu, Linlin
    Dong, Yachao
    Du, Jian
    OPTIMIZATION AND ENGINEERING, 2024, 25 (04) : 2369 - 2400
  • [33] Research on scheduling and optimization under uncertain conditions in panel block production line in shipbuilding
    Wang, Chong
    Mao, Puxiu
    Mao, Yunsheng
    Shin, Jong Gye
    INTERNATIONAL JOURNAL OF NAVAL ARCHITECTURE AND OCEAN ENGINEERING, 2016, 8 (04) : 398 - 408
  • [34] Study on production scheduling system for project-based remanufacturing
    Wang, Qifeng
    Journal of Convergence Information Technology, 2012, 7 (19) : 155 - 161
  • [35] Remanufacturing mode selection considering uncertain EOL products' quality and differential consumers' WTP
    Li, Bangyi
    Tang, Juan
    Liu, Zhi
    Gong, Bengang
    KYBERNETES, 2024, 53 (01) : 358 - 383
  • [36] Integrated remanufacturing scheduling of disassembly, reprocessing and reassembly considering energy efficiency and stochasticity through group teaching optimization and simulation approaches
    Fu, Yaping
    Zhang, Zhengpei
    Liang, Pei
    Tian, Guangdong
    Zhang, Chaoyong
    ENGINEERING OPTIMIZATION, 2024, 56 (12) : 2018 - 2039
  • [37] Robust optimization for integrated scrap steel charge considering uncertain metal elements concentrations and production scheduling under time-of-use electricity tariff
    Yang, Ye
    Chen, Weida
    Wei, Li
    Chen, Xu
    JOURNAL OF CLEANER PRODUCTION, 2018, 176 : 800 - 812
  • [38] Scheduling policies for remanufacturing
    Guide, VDR
    Kraus, ME
    Srivastava, R
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 48 (02) : 187 - 204
  • [39] Joint optimization of opportunistic maintenance and production scheduling considering batch production mode and varying operational conditions
    Xiao, Lei
    Zhang, Xinghui
    Tang, Junxuan
    Zhou, Yaqin
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2020, 202
  • [40] Optimization methods for disassembly scheduling problems with capacity constrains in remanufacturing system
    Chen, Weida
    Gao, Nan
    Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition), 2009, 39 (05): : 1081 - 1086