A Novel Genetic Simulated Annealing Algorithm for No-wait Hybrid Flowshop Problem with Unrelated Parallel Machines

被引:11
|
作者
Xuan, Hua [1 ,2 ]
Zheng, Qianqian [3 ]
Li, Bing [3 ,4 ]
Wang, Xueyuan [3 ]
机构
[1] Northeaster Univ, Shenyang, Liaoning, Peoples R China
[2] Zhengzhou Univ, Sch Management Engn, 100 Sci Rd, Zhengzhou 450001, Henan, Peoples R China
[3] Zhengzhou Univ, 100 Sci Rd, Zhengzhou 450001, Henan, Peoples R China
[4] Southweast Jiaotong Univ, Chengdu, Sichuan, Peoples R China
基金
中国国家自然科学基金;
关键词
hybrid flowshop; unrelated parallel machines; no-wait constraints; total flowtime; genetic simulated annealing algorithm; SHOP SCHEDULING PROBLEM; HEURISTIC ALGORITHMS; FLEXIBLE FLOWSHOP; 2-STAGE; MAKESPAN; TIME;
D O I
10.2355/isijinternational.ISIJINT-2020-258
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
This paper studies the problem of scheduling N jobs in a hybrid flowshop with unrelated parallel machines at each stage. Considering the practical application of the presented problem, no-wait constraints and the objective function of total flowtime are included in the scheduling problem. A mathematical model is constructed and a novel genetic simulated annealing algorithm so-called GSAA are developed to solve this problem. In the algorithm, firstly a modified NEH algorithm is proposed to obtain the initial population. A two-dimensional matrix encoding scheme for scheduling solutions is designed and an insertion-translation approach are employed for decoding in order to meet no-wait constraints. Afterwards, to avoid GA premature and enhance search ability, an adaptive adjustment strategy is imposed on the crossover and mutation operators. In addition, a SA procedure is implemented for some better individuals from the GA solutions to complete re-optimization, where five neighborhood search structures are constructed including job based exchange, gene based exchange, gene based insertion, job based mutation, and gene based mutation. Finally, various simulation experiments in two scales of small-medium and large are established. Computational results show that the presented algorithm performs much more effectively compared with several heuristic algorithms reported in the literature.
引用
收藏
页码:258 / 268
页数:11
相关论文
共 50 条
  • [21] A new hybrid ant colony algorithm for scheduling of no-wait flowshop
    Vahid Riahi
    Morteza Kazemi
    Operational Research, 2018, 18 : 55 - 74
  • [22] A novel hybrid estimation of distribution algorithm for solving hybrid flowshop scheduling problem with unrelated parallel machine
    Ze-wen Sun
    Xing-sheng Gu
    Journal of Central South University, 2017, 24 : 1779 - 1788
  • [23] A novel hybrid estimation of distribution algorithm for solving hybrid flowshop scheduling problem with unrelated parallel machine
    Sun Ze-wen
    Gu Xing-sheng
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2017, 24 (08) : 1779 - 1788
  • [24] A simulated annealing algorithm for the unrelated parallel machine scheduling problem
    Anagnostopoulos, GC
    Rabadi, G
    ROBOTICS, AUTOMATION AND CONTROL AND MANUFACTURING: TRENDS, PRINCIPLES AND APPLICATIONS, 2002, 14 : 115 - 120
  • [25] A Novel Parallel Simulated Annealing Methodology to Solve the No-Wait Flow Shop Scheduling Problem with Earliness and Tardiness Objectives
    Karacan, Ismet
    Senvar, Ozlem
    Bulkan, Serol
    PROCESSES, 2023, 11 (02)
  • [26] Two algorithms for no-wait flexible flowshop scheduling problem with no-idle machines
    Jin, Qingwei
    Xing, Wenxun
    Proceedings of the Sixth International Conference on Information and Management Sciences, 2007, 6 : 636 - 640
  • [27] A biogeography-based optimisation algorithm for a realistic no-wait hybrid flow shop with unrelated parallel machines to minimise mean tardiness
    Rabiee, M.
    Jolai, F.
    Asefi, H.
    Fattahi, P.
    Lim, S.
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2016, 29 (09) : 1007 - 1024
  • [28] Hybrid flexible flowshop scheduling problem with unrelated parallel machines and limited waiting times
    S. F. Attar
    M. Mohammadi
    R. Tavakkoli-Moghaddam
    The International Journal of Advanced Manufacturing Technology, 2013, 68 : 1583 - 1599
  • [29] Hybrid flexible flowshop scheduling problem with unrelated parallel machines and limited waiting times
    Attar, S. F.
    Mohammadi, M.
    Tavakkoli-Moghaddam, R.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (5-8): : 1583 - 1599
  • [30] A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem
    Pan, Quan-Ke
    Tasgetiren, M. Fatih
    Liang, Yun-Chia
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (09) : 2807 - 2839