Lessons Learned from the Construction of Artificial Beaches in Okinawa

被引:0
|
作者
Uda, T. [1 ]
Date, A. [1 ]
Onaka, S. [2 ]
Ichikawa, S. [2 ]
机构
[1] Publ Works Res Ctr, Taito Ku, 1-6-4 Taito, Tokyo 1100016, Japan
[2] Nippon Koei Co Ltd, Chiyoda Ku, 1-14-6 Kudan Kita, Tokyo 1028539, Japan
关键词
Okinawa artificial; pocket beach; lessons; Sunset Beach; Araha Beach; Nagayama Beach;
D O I
10.1007/978-981-15-0291-0_52
中图分类号
P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
In Okinawa, the coastal zone has extensively developed around the island, and it has become difficult to find completely natural sandy beaches with a coral reef. As measures against the disappearance of natural sandy beaches, artificial beaches have been constructed at many coasts. In every case, groins have been constructed on both sides to contain the nourishment sand inside the artificial pocket beach. However, satisfactory results have not necessarily been attained despite these efforts. In this study, three artificial beaches have been adopted as the examples, and the lessons were learned from these examples.
引用
收藏
页码:369 / 376
页数:8
相关论文
共 50 条
  • [21] No more construction delays: Lessons learned from wastewater, water experience
    Hutchison, A.W.
    Water Environment and Technology, 1996, 8 (07):
  • [22] Haiti: post-earthquake lessons learned from traditional construction
    Audefroy, Joel F.
    ENVIRONMENT AND URBANIZATION, 2011, 23 (02) : 447 - 462
  • [23] NDN Construction for Big Science: Lessons Learned from Establishing a Testbed
    Lim, Huhnkuk
    Ni, Alexander
    Kim, Dabin
    Ko, Young-Bae
    Shannigrahi, Susmit
    Papadopoulos, Christos
    IEEE NETWORK, 2018, 32 (06): : 124 - 136
  • [24] Lessons learned from the 2018 Florida bridge collapse during construction
    Structural Engineer, 2024, 102 (05): : 12 - 13
  • [25] Lessons learned from the cuantitative risk analysis of a dam under construction
    Sanz-Jimenez, D.
    Escuder-Bueno, I.
    Silva-Tulla, F.
    RISK ANALYSIS, DAM SAFETY, DAM SECURITY AND CRITICAL INFRASTRUCTURE MANAGEMENT, 2012, : 291 - 300
  • [26] Emotion Monitor - Concept, Construction and Lessons Learned
    Landowska, Agnieszka
    PROCEEDINGS OF THE 2015 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS, 2015, 5 : 75 - 80
  • [27] Supporting collaborative construction of knowledge: Lessons learned
    Prasolova-Forland, Ekaterina
    Divitini, Monica
    PROCEEDINGS OF THE EIGHTH IASTED INTERNATIONAL CONFERENCE ON COMPUTERS AND ADVANCED TECHNOLOGY IN EDUCATION, 2005, : 147 - 152
  • [28] TRANSFERRING CONSTRUCTION INNOVATION INTO PRACTICE - LESSONS LEARNED
    GERWICK, B
    EXCELLENCE IN THE CONSTRUCTED PROJECT, 1989, : 530 - 533
  • [29] A lessons learned database structure for construction companies
    Eken, Gorkem
    Bilgin, Gozde
    Dikmen, Irem
    Birgonul, M. Talat
    CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS, 2015, 123 : 135 - 144
  • [30] Top ten lessons learned in construction contracting
    Arizona State Univ, Tempe, United States
    Cost Eng (Morgantown WVa), 5 (20-24):