Design a turnkey floating LNG facility

被引:0
|
作者
Harrold, D [1 ]
机构
[1] KBR, London, England
来源
HYDROCARBON PROCESSING | 2004年 / 83卷 / 07期
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
引用
收藏
页码:47 / +
页数:4
相关论文
共 50 条
  • [41] Addressing the Challenges of LNG Facility Siting
    Havens, Jerry
    Lederman, Peter B.
    CHEMICAL ENGINEERING PROGRESS, 2010, 106 (09) : 6 - 6
  • [42] AUTOMATED LNG BLENDING FACILITY.
    Martin, Steve A.
    1978,
  • [43] LNG facility planned in British Columbia
    Whetton, C
    INTECH, 1997, 44 (10) : 22 - &
  • [44] Issues related to localization of an LNG facility
    Vatn, J.
    RELIABILITY, RISK AND SAFETY: THEORY AND APPLICATIONS VOLS 1-3, 2010, : 917 - 921
  • [45] TURNKEY MAY NOT ALWAYS UNLOCK CONCURRENT DESIGN
    MERRITT, FS
    CIVIL ENGINEERING, 1993, 63 (12): : 39 - 39
  • [46] Offshore LNG solution-LNG floating production storage and offloading plant
    Gu, Y.
    Ju, Y. L.
    CRYOGENICS AND REFRIGERATION, PROCEEDINGS, 2008, : 269 - 274
  • [47] Safe offloading from floating LNG platforms
    Guedes Soares, C.
    Taylor, R. Eatock
    Ewans, K.
    APPLIED OCEAN RESEARCH, 2015, 51 : 252 - 254
  • [48] Regas units for floating LNG being installed
    不详
    OIL & GAS JOURNAL, 2009, 107 (28) : 33 - 33
  • [49] Consider new approach for floating LNG units
    Caswell, C.
    Durr, C.
    Rost, E.
    Kilcran, M.
    HYDROCARBON PROCESSING, 2009, 88 (07): : 41 - 49
  • [50] Floating LNG systems - Export and import terminals
    Denney, Dennis
    JPT, Journal of Petroleum Technology, 2006, 58 (04): : 90 - 92