Heuristics for no-wait flowshops with makespan subject to mean completion time

被引:26
|
作者
Aydilek, Harun [1 ]
Allahverdi, Ali [2 ]
机构
[1] Gulf Univ Sci & Technol, Dept Math & Nat Sci, POB 7207, Hawally 32093, Kuwait
[2] Kuwait Univ, Dept Ind & Management Syst Engn, Safat, Kuwait
关键词
Scheduling; No-wait flowshop; Heuristic; Makespan; Mean completion time; FLOW-SHOP PROBLEM; SCHEDULING PROBLEM; SETUP TIMES; PERMUTATION FLOWSHOP; MINIMIZE MAKESPAN; JOB-SHOP; ALGORITHMS; SIMULATION; OPTIMIZATION;
D O I
10.1016/j.amc.2012.06.024
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
This paper addresses the m-machine no-wait flowshop scheduling problem. Two performance measures are considered; makespan and mean completion time. The objective is to find a sequence that minimizes makespan such that mean completion time is not greater than a certain value. In case such a certain value is not known, an algorithm is presented to find an upper bound on the mean completion time. A heuristic, called HA, a simulated annealing (SA) heuristic, a modified simulated annealing (mSA) heuristic, and two more heuristics, called HH1 and HH2, which are combination of HA and mSA, are proposed for the problem. The proposed heuristics are assessed on randomly generated problems with different number of jobs and machines. Computational experiments revealed that the overall average relative errors of SA, HA, mSA, HH1 and HH2, were 2.99, 1.33, 0.78, 0.04, and 0.87, respectively. These results are also statistically verified. Therefore, the heuristic HH1 significantly outperforms the other heuristics. (C) 2012 Elsevier Inc. All rights reserved.
引用
收藏
页码:351 / 359
页数:9
相关论文
共 50 条
  • [42] Heuristic for no-wait flow shops with makespan minimization
    Li, Xiaoping
    Wang, Qian
    Wu, Cheng
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (09) : 2519 - 2530
  • [43] New high performing heuristics for minimizing makespan in permutation flowshops
    Rad, Shahriar Farahmand
    Ruiz, Ruben
    Boroojerdian, Naser
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2009, 37 (02): : 331 - 345
  • [44] A NOTE ON MINIMIZING THE EXPECTED MAKESPAN IN FLOWSHOPS SUBJECT TO BREAKDOWNS
    DU, C
    PINEDO, M
    NAVAL RESEARCH LOGISTICS, 1995, 42 (08) : 1251 - 1262
  • [45] Improved Beam Search for Optimizing No-Wait Flowshops With Release Times
    Pourhejazy, Pourya
    Lin, Shih-Wei
    Cheng, Chen-Yang
    Ying, Kuo-Ching
    Lin, Pei-Yu
    IEEE ACCESS, 2020, 8 : 148100 - 148124
  • [46] No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan
    Allahverdi, Ali
    Aydilek, Harun
    Aydilek, Asiye
    APPLIED MATHEMATICS AND COMPUTATION, 2020, 365
  • [47] New heuristics to minimize total completion time in m-machine flowshops
    Allahverdi, A
    Aldowaisan, T
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 77 (01) : 71 - 83
  • [48] Evaluating the performance for makespan minimisation in no-wait flowshop sequencing
    Framinan, Jose M.
    Nagano, Marcelo S.
    JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2008, 197 (1-3) : 1 - 9
  • [49] On no-wait and no-idle flow shops with makespan criterion
    Kalczynski, Pawel Jan
    Kamburowski, Jerzy
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 178 (03) : 677 - 685
  • [50] An improved heuristic for no-wait flow shop to minimize makespan
    Ye, Honghan
    Li, Wei
    Abedini, Amin
    JOURNAL OF MANUFACTURING SYSTEMS, 2017, 44 : 273 - 279