How to avoid stockouts when producing several items on a single facility? What to do if you can't?

被引:10
作者
Gallego, G
Moon, I
机构
[1] PUSAN NATL UNIV,DEPT IND ENGN,PUSAN 609735,SOUTH KOREA
[2] COLUMBIA UNIV,DEPT IND ENGN & OPERAT RES,NEW YORK,NY 10027
关键词
D O I
10.1016/0305-0548(95)O0020-T
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper considers the Multiple Product Single Facility Stockout Avoidance Problem (SAP). That is the problem of determining, given initial inventories, whether there is a multiple product single facility production schedule that avoids stockouts over a given time horizon. The optimization version of the SAP where stockouts are penalized linearly is also studied. We call this problem the Weighted Stockout Problem (WSP). Both problems are NP-hard in the strong sense. Mixed Integer Linear Programming (MIP) formulations for both the SAP and the WSP are developed. We show that there exist polynomial algorithms for some special cases of the SAP and the WSP. We have also developed heuristics and computational results.
引用
收藏
页码:1 / 12
页数:12
相关论文
共 11 条
[1]   TESTING FEASIBILITY IN A LOT SCHEDULING PROBLEM [J].
ANDERSON, EJ .
OPERATIONS RESEARCH, 1990, 38 (06) :1079-1088
[2]  
Baker KR., 1974, Introduction to Sequencing and Scheduling
[3]   THE ECONOMIC LOT-SCHEDULING PROBLEM - ACHIEVING FEASIBILITY USING TIME-VARYING LOT SIZES [J].
DOBSON, G .
OPERATIONS RESEARCH, 1987, 35 (05) :764-771
[4]   SCHEDULING THE PRODUCTION OF SEVERAL ITEMS WITH RANDOM DEMANDS IN A SINGLE FACILITY [J].
GALLEGO, G .
MANAGEMENT SCIENCE, 1990, 36 (12) :1579-1592
[5]  
GALLEGO G, 1992, NAV RES LOG, V39, P729, DOI 10.1002/1520-6750(199208)39:5<729::AID-NAV3220390510>3.0.CO
[6]  
2-N
[7]  
GALLEGO G, 1995, NAV RES LOG, V42, P773, DOI 10.1002/1520-6750(199508)42:5<773::AID-NAV3220420505>3.0.CO
[8]  
2-F
[9]   THE EFFECT OF EXTERNALIZING SETUPS IN THE ECONOMIC LOT SCHEDULING PROBLEM [J].
GALLEGO, G ;
MOON, I .
OPERATIONS RESEARCH, 1992, 40 (03) :614-619