THE EFFECT OF EXTERNALIZING SETUPS IN THE ECONOMIC LOT SCHEDULING PROBLEM

被引:33
作者
GALLEGO, G
MOON, I
机构
[1] Columbia University, New York, NY
关键词
D O I
10.1287/opre.40.3.614
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper considers the Economic Lot Scheduling Problem with Reducible Setup Times (ELSP-RS), that is, determining a multiple product, single facility cyclic schedule to minimize holding and setup costs when setup times can be reduced, at the expense of setup costs, by externalizing setup operations. We develop an efficient algorithm that finds an optimal or near-optimal production schedule. Computational results indicate that dramatic savings are possible for highly utilized facilities.
引用
收藏
页码:614 / 619
页数:6
相关论文
共 13 条
[1]  
BOMBERGER E, 1966, MANAGE SCI, V12, P778
[2]   THE ECONOMIC LOT-SCHEDULING PROBLEM - ACHIEVING FEASIBILITY USING TIME-VARYING LOT SIZES [J].
DOBSON, G .
OPERATIONS RESEARCH, 1987, 35 (05) :764-771
[3]   SCHEDULING THE PRODUCTION OF SEVERAL ITEMS WITH RANDOM DEMANDS IN A SINGLE FACILITY [J].
GALLEGO, G .
MANAGEMENT SCIENCE, 1990, 36 (12) :1579-1592
[4]  
GALLEGO G, 1988, IN PRESS NAVAL RES L
[5]   LOT SIZES, LEAD TIMES AND IN-PROCESS INVENTORIES [J].
KARMARKAR, US .
MANAGEMENT SCIENCE, 1987, 33 (03) :409-418
[6]  
Luenberger D. G., 1984, LINEAR NONLINEAR PRO
[7]  
MAXWELL W, 1989, RES AGENDA MODELS PL
[8]   CONTROLLABLE PRODUCTION-RATES IN A FAMILY PRODUCTION CONTEXT [J].
MOON, I ;
GALLEGO, G ;
SIMCHILEVI, D .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (12) :2459-2470
[10]  
SHELDON B, 1987, INDUCE IDLE TIME EC