Waste-to-Energy Facility Planning Supported by Stochastic Programming - Part II Model Development and Application

被引:3
|
作者
Somplak, Radovan [1 ]
Tous, Michal [1 ]
Ferdan, Tomas [1 ]
Pavlas, Martin [1 ]
Popela, Pavel
机构
[1] Brno Univ Technol UPEI VUT, Inst Proc & Environm Engn, Fac Mech Engn, Brno 61669, Czech Republic
关键词
D O I
10.3303/CET1229124
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper deals with the development and presentation of the use of computational optimization tool for the conceptual planning of facilities in the field of waste-to-energy (WTE). Decision about individual facility parameters includes in particular the determination of suitable capacity and selection of appropriate heat recovery system according to heat released utilization strategy (i.e. either only electricity production or combined heat and power if feasible). The main goal is to ensure the economic feasibility of the project. An optimization tool that was created in the system GAMS (General Algebraic Modelling System) was developed for this purpose and is introduced in this paper. Realization of a new plant from the initial considerations to its full operation is a long-term process with duration at minimum 5 to 7 years. The erection is then followed by operational phase exceeding 20 years. At the beginning of the project (preparation of implementation phase) when important decisions related to the technology selection are made, the future development of many parameters affecting project sustainability are not clear. The developed tool takes these aspects into account by implementing elements of stochastic programming that allow this uncertainty and randomness to be reflected in optimization problems and, hence, proposed solution. In the article, a brief theory related to uncertainties (approach wait and see and/or here and now, definitions and use of scenarios), is given by first, followed by a description of a mathematical problem and demonstration of using tools through the case study.
引用
收藏
页码:739 / 744
页数:6
相关论文
共 50 条
  • [31] Energy and Environmental Systems Planning with Recourse: Inexact Stochastic Programming Model Containing Fuzzy Boundary Intervals in Objectives and Constraints
    Hu, Qing
    Huang, Guohe
    Cai, Yanpeng
    Xu, Ye
    JOURNAL OF ENERGY ENGINEERING, 2013, 139 (03) : 169 - 189
  • [32] Development of a waste load allocation model for the Charleston Harbor Estuary - Part III: project application
    Yassuda, Eduardo A.
    Peene, Steven J.
    Davie, Steven R.
    Mendelson, Daniel L.
    Isaji, Tatsu
    Proceedings of the International Conference on Estuarine and Coastal Modeling, 2000, : 1275 - 1293
  • [33] Inexact fuzzy-stochastic mixed integer programming approach for long-term planning of waste management-Part B: Case study
    Guo, P.
    Huang, G. H.
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2009, 91 (02) : 441 - 460
  • [34] Development of a stochastic multistage lifecycle programming model for electric power system planning - A case study for the Province of Saskatchewan, Canada
    Zhang, Xiaoyue
    Huang, Guohe
    Liu, Lirong
    Li, Kailong
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2022, 158
  • [35] Trilateral Planning Model for Integrated Community Energy Systems and PV-Based Prosumers-A Bilevel Stochastic Programming Approach
    Pourakbari-Kasmaei, Mahdi
    Asensio, Miguel
    Lehtonen, Matti
    Contreras, Javier
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2020, 35 (01) : 346 - 361
  • [36] A stochastic optimization model under modeling uncertainty and parameter certainty for groundwater remediation design: Part II. Model application
    He, L.
    Huang, G. H.
    Lu, H. W.
    JOURNAL OF HAZARDOUS MATERIALS, 2010, 176 (1-3) : 527 - 534
  • [37] Development of a generalized neural network model to detect faults in building energy performance - Part II
    Breekweg, Marcus R.B.
    Gruber, Peter
    Ahmed, Osman
    ASHRAE Transactions, 2000, 106
  • [38] Application of finite deformation theory to the development of an orthogonal cutting model - Part II: Experimental investigation and model validation
    Zheng, Yuliu
    Hu, Xuefei
    Sutherland, John W.
    JOURNAL OF MANUFACTURING SCIENCE AND ENGINEERING-TRANSACTIONS OF THE ASME, 2006, 128 (03): : 767 - 774
  • [39] Planning of energy system management and GHG-emission control in the Municipality of Beijing-An inexact-dynamic stochastic programming model
    Lin, Q. G.
    Huang, G. H.
    ENERGY POLICY, 2009, 37 (11) : 4463 - 4473
  • [40] Using Weighted Goal Programming Model for Planning Regional Sustainable Development to Optimal Workforce Allocation: An Application for Provinces of Iran
    Hashem Omrani
    Mahsa Valipour
    Ali Emrouznejad
    Social Indicators Research, 2019, 141 : 1007 - 1035