A management design approach to a simple flexible assembly system

被引:12
|
作者
Nakase, N [1 ]
Yamada, T [1 ]
Matsui, M [1 ]
机构
[1] Univ Electrocommun, Dept Syst Engn, Chofu, Tokyo 1828585, Japan
关键词
flexible assembly system; 2-stage design method; generalized CSPS; ordered-entry type queue; stochastic system balancing;
D O I
10.1016/S0925-5273(01)00193-1
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers the simple flexible assembly system (simple FAS) consisting of Generalized CSPSs, and presents a strategic management design approach to stochastic system balancing problems of simple FAS. First, the simple FAS is briefly outlined. Next, the 2-stage design procedure is presented to both types of the existing and installation problems of production facilities. Third, an optimal design example is shown and discussed numerically. Finally, the production matrix tables of both types are given under the cycle time, d, and the number of Generalized CSPSs, K, and a strategic relation of economic traffic (d, K) and leadtime is discussed. From these discussions, it is shown that the proposed approach is very useful. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:281 / 292
页数:12
相关论文
共 50 条
  • [21] Design of a tool management system in a flexible cell
    Int J Prod Res, 3 (767-784):
  • [22] Design and implementation of a flexible workflow management system
    Guo, Yubin
    Cai, Zeye
    Lin, Zewei
    Li, Ximing
    Journal of Software, 2013, 8 (12) : 3060 - 3065
  • [23] Design of a tool management system in a flexible cell
    Macchiaroli, R
    Riemma, S
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (03) : 767 - 784
  • [24] Assembly system design: A branch and cut approach
    Asian Inst of Technology, Patumtani, Thailand
    Manage Sci, 1 (103-118):
  • [25] Automated Inspection of Flexible Assembly: System Design and Algorithm Research
    Wen, Peihan
    Zheng, Li
    Zhou, Jian
    Clarke, Burton
    PROCEEDINGS OF 2008 IEEE/ASME INTERNATIONAL CONFERENCE ON MECHATRONIC AND EMBEDDED SYSTEMS AND APPLICATIONS, 2008, : 222 - +
  • [26] Assembly system design: A branch and cut approach
    Pinnoi, A
    Wilhelm, WE
    MANAGEMENT SCIENCE, 1998, 44 (01) : 103 - 118
  • [27] INTEGRATIVE CYCLE SCHEDULING APPROACH FOR A CAPACITATED FLEXIBLE ASSEMBLY SYSTEM
    KIM, D
    MABERT, VA
    PINTO, PA
    DECISION SCIENCES, 1993, 24 (01) : 126 - 147
  • [28] A FLEXIBLE ASSEMBLY SYSTEM
    SCHRODER, M
    WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1981, 71 (01): : 33 - 38
  • [29] Assembly planning in the design of flexible assembly systems
    Stadzisz, PC
    Henrioud, JM
    INTELLIGENT MANUFACTURING SYSTEMS 1998 (IMS'98), 1999, : 133 - 138
  • [30] The design of flexible assembly lines
    Fitton, S
    Mileham, AR
    Owen, GW
    ADVANCES IN MANUFACTURING TECHNOLOGY - XVII, 2003, : 179 - 184