A management design approach to a simple flexible assembly system

被引:12
|
作者
Nakase, N [1 ]
Yamada, T [1 ]
Matsui, M [1 ]
机构
[1] Univ Electrocommun, Dept Syst Engn, Chofu, Tokyo 1828585, Japan
关键词
flexible assembly system; 2-stage design method; generalized CSPS; ordered-entry type queue; stochastic system balancing;
D O I
10.1016/S0925-5273(01)00193-1
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers the simple flexible assembly system (simple FAS) consisting of Generalized CSPSs, and presents a strategic management design approach to stochastic system balancing problems of simple FAS. First, the simple FAS is briefly outlined. Next, the 2-stage design procedure is presented to both types of the existing and installation problems of production facilities. Third, an optimal design example is shown and discussed numerically. Finally, the production matrix tables of both types are given under the cycle time, d, and the number of Generalized CSPSs, K, and a strategic relation of economic traffic (d, K) and leadtime is discussed. From these discussions, it is shown that the proposed approach is very useful. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:281 / 292
页数:12
相关论文
共 50 条
  • [1] Design of Intelligent Management and Control System of Flexible Transmission Assembly Line
    Chang, Kai
    Xing, Yun
    Yin, Jian
    Zheng, DeChao
    2018 EIGHTH INTERNATIONAL CONFERENCE ON INSTRUMENTATION AND MEASUREMENT, COMPUTER, COMMUNICATION AND CONTROL (IMCCC 2018), 2018, : 756 - 760
  • [2] Generic flexible assembly system design
    Edmondson, NF
    Redford, AH
    ASSEMBLY AUTOMATION, 2002, 22 (02) : 139 - 152
  • [3] Integrated flexible design and assembly system
    Boër, CR
    Pedrazzoli, P
    Rinaldi, R
    De Pascale, G
    Larizza, P
    Chiabra, P
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2003, 217 (06) : 843 - 848
  • [4] Metaheuristics for a Flexible Assembly System Design Problem
    Jacobson S.H.
    Johnson A.W.
    Sullivan K.A.
    Fleischer M.A.
    Kumar A.
    Journal of Heuristics, 1997, 3 (2) : 139 - 159
  • [5] Design of a flexible robot assembly demo system
    Dun, XM
    Sun, B
    Zhang, WJ
    Yang, RQ
    PROCEEDINGS OF THE 4TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-4, 2002, : 1343 - 1346
  • [6] Design of random inspection rate for a flexible assembly system: A heuristic genetic algorithm approach
    Lin, Chinho
    Yeh, Jong-Mau
    Ding, Jieh-Rern
    Microelectronics Reliability, 1998, 38 (04): : 545 - 551
  • [7] Design of random inspection rate for a flexible assembly system: A heuristic genetic algorithm approach
    Lin, CH
    Yeh, JM
    Ding, JR
    MICROELECTRONICS AND RELIABILITY, 1998, 38 (04): : 545 - 551
  • [8] Adam-Eve-like genetic algorithm: a methodology for optimal design of a simple flexible assembly system
    Feyzbakhsh, SA
    Matsui, M
    COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 36 (02) : 233 - 258
  • [9] Adam-Eve-like genetic algorithm: a methodology for optimal design of a simple flexible assembly system
    Feyzbakhsh, S. Alireza
    Matsui, Masayuki
    Computers and Industrial Engineering, 1999, 36 (02): : 233 - 258
  • [10] Flexible Design for Battery Management System
    Zuo, Xiaoyan
    Zhang, Chengjun
    2016 INTERNATIONAL CONFERENCE ON NETWORK AND INFORMATION SYSTEMS FOR COMPUTERS (ICNISC), 2016, : 168 - 172