Probabilistic models for tunnel construction risk assessment

被引:30
|
作者
Spackova, Olga [1 ,2 ]
Novotna, Eva [1 ]
Sejnoha, Michal [1 ]
Sejnoha, Jiri [1 ]
机构
[1] Czech Tech Univ, Fac Civil Engn, Prague, Czech Republic
[2] Tech Univ Munich, Fac Civil Geo & Environm Engn, Engn Risk Anal Grp, D-80290 Munich, Germany
关键词
Tunnelling; Construction project; Failure rate; Probabilistic modelling; Risk assessment; Decision-making; Utility; Human factor; PROJECTS; METRO;
D O I
10.1016/j.advengsoft.2013.04.002
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The paper introduces different probabilistic models for prediction of tunnel construction risk. First, a simple probabilistic model for the estimation of the damage due to tunnel construction failures (e.g. cave-in collapses) is proposed. It can be used in conjunction with a deterministic estimate of the construction time/costs as a support for decision-making in tunnel construction projects. The occurrence of failures is modelled as an inhomogeneous Poisson process. The model takes into account the heterogeneity of the environment along the tunnel (changing geological conditions, changing damage potential) and it includes the influence of common factors such as human and organisational aspects. The damages caused by the failures are modelled as uncertain and they are thus represented by full probability distributions in the model. Second, the decision-making under uncertainty in construction projects is discussed. The use of the concept of utility for considering the attitude of the stakeholder to risk is demonstrated. The simple probabilistic model and the decision-making concept are applied to a case study of construction of a 480-m-long tunnel. Third, stochastic models for specific problems of tunnel construction, such as impacts of excavation on surface structures or probabilistic prediction of thickness of rock overburden, are introduced. The use of the models is illustrated on an example from Blanka tunnel in Prague. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:72 / 84
页数:13
相关论文
共 50 条
  • [21] Review of Probabilistic Risk Assessment Models for Ship Collisions with Structures
    Xiao, Fangliang
    Ma, Yong
    Wu, Bo
    APPLIED SCIENCES-BASEL, 2022, 12 (07):
  • [22] Risk Assessment of Water Penetration for Shield Tunnel Construction in Coastal Area
    Wu Bo
    Deng Zheng
    Huang Wei
    2019 3RD INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2019), 2019, 267
  • [23] Research on the Risk Assessment and Countermeasures for the Construction in Lion Ocean Subaqueous Tunnel
    Xiao Mingqing
    Huang Yiliang
    Xu Zhisheng
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL VII, PTS A AND B, 2008, 7 : 325 - 329
  • [24] Risk Comprehensive Assessment of Shield Tunnel Construction Based on Cloud Theory
    Fu, Helin
    Huang, Zhen
    Zhang, Jiabing
    GEO-RISK 2017: GEOTECHNICAL RISK ASSESSMENT AND MANAGEMENT, 2017, (285): : 334 - 345
  • [25] Dynamic risk assessment of the subsea tunnel construction process: Analytical model
    Qiu, Daohong
    Cui, Jiuhua
    Xue, Yiguo
    Liu, Yang
    Fu, Kang
    Journal of Marine Environmental Engineering, 2019, 10 (03): : 195 - 210
  • [26] Study on Risk Assessment of Major Hazard Installations for Highway Tunnel Construction
    Liu Hui
    Zhang Zhichao
    Liu Qiang
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL. VIII, PTS A AND B, 2010, 8 : 2229 - 2235
  • [27] A REVIEW OF FUZZY RISK ASSESSMENT MODELS FOR CONSTRUCTION PROJECTS
    Rezakhani, P.
    SLOVAK JOURNAL OF CIVIL ENGINEERING, 2012, 20 (03) : 35 - 40
  • [28] Risk Management in Tunnel Construction
    不详
    BAUINGENIEUR, 2017, 92 : A16 - A16
  • [29] Probabilistic risk assessment
    Sielken, RL
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 1996, 211 : 179 - AGRO
  • [30] Risk Assessment of SLAs in Grid Computing with Predictive Probabilistic and Possibilistic Models
    Carlsson, Christer
    Fuller, Robert
    PREFERENCES AND DECISIONS: MODELS AND APPLICATIONS, 2010, 257 : 11 - 29