Strategic Total Highway Asset Management Integration

被引:2
|
作者
Posavljak, Milos [1 ]
Tighe, Susan L. [1 ]
Godin, Jerry W. [2 ]
机构
[1] Univ Waterloo, Waterloo, ON N2L301, Canada
[2] Investment Planning & Performance Off, Investment Strategies Branch, Prov Highways Management Div, Minist Transportat,Highway Infrastruct Business S, St Catharines, ON L2R 7R4, Canada
关键词
D O I
10.3141/2354-11
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
To manage a significant quantity of aging roadway infrastructure and growing traffic volume successfully, agencies are faced with challenges in developing reliable long-term plans that maximize network performance by optimizing programming preservation projects at the network level. Current practice typically involves relatively independent planning for bridge and pavement subassets, with a slight number of situations allowing for reliable trade-off analysis between the two. The choice to improve two bridges rather than one pavement section may yield a greater percentage increase in the bridge network performance than one pavement section would for the pavement network performance. The reliability of this choice being right and at the right time significantly decreases over the long term. Mutually inclusive highway asset planning by an integration of the bridge subasset into pavement subasset significantly increases long-term planning reliability. A key point of this strategic total highway asset management integration (STHAMi) approach is the conceptual structural integration factor. Integrating the bridge condition index into a pavement performance index allows for the treatment of bridges as equivalent pavement sections. STHAMi resulted in a higher percentage of model network treated per unit of value, coupled with consistently higher annual network performance during a 25-year span. Key benefits include the introduction of one pavement performance indicator as an overall encompassing highway performance measure for combined long-term bridge and pavement subasset planning. The approach makes long-term planning for both subassets possible in a pavement-oriented engineering organizational unit.
引用
收藏
页码:107 / 114
页数:8
相关论文
共 50 条
  • [41] Best practice in advanced asset management systems for the highway sector in the UK
    Webster, JS
    Allan, ND
    2005 IEEE International Engineering Management Conference, Vols 1 and 2, 2005, : 861 - 867
  • [42] Exploring the value of digital twins for information management in highway asset maintenance
    Yin, Mengtian
    Reja, Varun Kumar
    Wei, Ran
    Brilakis, Ioannis
    Sheil, Brian
    Perrotta, Federico
    d'Avigneau, Alix Marie
    Lu, Linjun
    DEVELOPMENTS IN THE BUILT ENVIRONMENT, 2025, 21
  • [43] Integration analysis of enterprise project management and strategic management
    Lu, WX
    An, SL
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: MODERN INDUSTRIAL ENGINEERING AND INNOVATION IN ENTERPRISE MANAGEMENT, 2005, : 1441 - 1444
  • [44] Strategic human asset management: evidence from North America
    Ananthram, Subramaniam
    Nankervis, Alan
    Chan, Christopher
    PERSONNEL REVIEW, 2013, 42 (03) : 281 - 299
  • [45] Strategic Asset Information Management: Experiences from Finnish Companies
    Hanski, Jyri
    Jannes, Jere
    Ojanen, Ville
    Valkokari, Pasi
    PROCEEDINGS OF THE 10TH WORLD CONGRESS ON ENGINEERING ASSET MANAGEMENT (WCEAM 2015), 2016, : 227 - 236
  • [46] The experience of luxury craftsmanship - a strategic asset for luxury experience management
    Tarquini, Annalisa
    Muhlbacher, Hans
    Kreuzer, Maria
    JOURNAL OF MARKETING MANAGEMENT, 2022, 38 (13-14) : 1307 - 1338
  • [47] Understanding and implementing strategic asset management at the University of Southern Queensland
    Povey, David
    Peach, Neil
    FACILITIES, 2013, 31 (7-8) : 343 - 356
  • [48] Linking strategic and tactical planning systemsfor asset and liability management
    John M. Mulvey
    Chris Madsen
    François Morin
    Annals of Operations Research, 1999, 85 : 249 - 266
  • [49] Strategic infrastructure asset management: a conceptual framework to identify capabilities
    Too, Eric
    Too, Linda
    JOURNAL OF CORPORATE REAL ESTATE, 2010, 12 (03) : 196 - +
  • [50] Linking strategic and tactical planning systems for asset and liability management
    Mulvey, JM
    Madsen, C
    Morin, F
    ANNALS OF OPERATIONS RESEARCH, 1999, 85 (0) : 249 - 266