STEAM GENERATOR ASSET MANAGEMENT PROGRAM

被引:0
|
作者
Prabhu, Padmanabha J. [1 ]
Testa, Damian A. [1 ]
机构
[1] Westinghouse Elect Co, Madison, PA USA
来源
PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 1 | 2011年
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The Steam Generator Asset Management Program (SGAMP) is a long term program designed to maximize the performance and reliability of the steam generators. The SGAMP focuses on plant specific conditions and hence is applicable to the original or the replacement steam generators. It is recommended that the utility and the vendor form a joint steam generator management team (SGMT) to develop, monitor and implement a long-term plan to address steam generator operation, maintenance and life extension goals. The SGMT will consist of representatives from operations, chemistry, maintenance and engineering functions and will be responsible for making decisions related to the steam generators. The charter of the SGMT is to develop a steam generator strategic plan that will cost-effectively manage steam generator options. The strategic plan is consistent with the Steam Generator Program Guidelines (NEI 97-06 in the United States). The strategic plan is a living document and is revised periodically to incorporate inspection results, new technology developments, lessons learned and industry experience. Cost-benefit analyses of strategies may be performed to prolong steam generator operability through steam generator performance modeling (tube degradation, fouling, etc.), diagnostic tools, regulatory strategy, condition monitoring and operational assessment strategy, and maintenance strategy. The SGMT will provide input regarding potential maintenance of the steam generators with schedule and cost impacts for each outage. It will also recommend engineering evaluations to be performed in support of program goals and will develop short- and long-term recommendations. These recommendations will address action plans, performance measures and results. Secondary side 171 inspection and cleaning strategy should be developed (techniques and frequency) to maximize performance cost-effectively. This paper is based on Westinghouse experience gained by working with several pressurized water reactor (PWR) plant operators in the United States (US).
引用
收藏
页码:171 / 176
页数:6
相关论文
共 50 条
  • [21] The Application of Media Asset Management System in Television Program Operation
    Wang, Xi
    Dong, Haining
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON TEACHING AND COMPUTATIONAL SCIENCE, 2014, : 14 - 17
  • [22] Can a Small System Develop an Effective Asset Management Program?
    Copeland, Ari
    Opflow, 2013, 39 (01) : 6 - 7
  • [23] Recycling of engineering thermoplastics - An enabler for a total asset management program
    BerkoBoateng, V
    GROWTH OR MORE RE-ENGINEERING AHEAD?, 1997, : 1 - 12
  • [24] Setting the Stage for a Geotechnical Asset Management Program in the State of Georgia
    Torres, Jose M.
    Macedo, Jorge
    Burns, Susan E.
    Jung, Youngsuk
    Jones, Kalen
    Cooley, Mary
    Armstrong, Catherine
    Adelakun, Adebola
    GEO-CONGRESS 2022: SITE AND SOIL CHARACTERIZATION, COMPUTATIONAL GEOTECHNICS, RISK, AND LESSONS LEARNED, 2022, 333 : 290 - 300
  • [25] INTERPRETING FRENCH LIQUID-METAL-HEATED STEAM-GENERATOR PROGRAM
    SMITH, FA
    POWER REACTOR TECHNOLOGY, 1966, 9 (02): : 69 - &
  • [26] A COMPUTER-PROGRAM FOR TRANSIENT ANALYSIS OF STEAM-TURBINE GENERATOR OVERSPEED
    HEJZLAR, P
    UBRA, O
    AMBROZ, J
    NUCLEAR ENGINEERING AND DESIGN, 1993, 144 (03) : 469 - 485
  • [27] 1 MWth SOLAR CAVITY STEAM GENERATOR SOLAR TEST PROGRAM.
    Tracey, T.R.
    Blake, F.A.
    Royere, C.
    Brown, C.T.
    Proceedings of the Intersociety Energy Conversion Engineering Conference, 1977, : 1224 - 1230
  • [28] Implementation Status of Performance Demonstration Program for Steam Generator Tubing Analysts in Korea
    Cho, Chan-Hee
    Lee, Hee-Jong
    Yoo, Hyun-Ju
    Nam, Min-Woo
    Hong, Sung-Yull
    JOURNAL OF THE KOREAN SOCIETY FOR NONDESTRUCTIVE TESTING, 2013, 33 (01) : 63 - 68
  • [29] STEAM-GENERATOR CHEMICAL CLEANING PROGRAM AT ARKANSAS-NUCLEAR-ONE
    LAWSON, BR
    HARRIS, DC
    MECHANICAL ENGINEERING, 1983, 105 (10) : 90 - 90
  • [30] Implement a Sustainable Steam-Trap Management Program
    Walter, Jonathan P.
    CHEMICAL ENGINEERING PROGRESS, 2014, 110 (01) : 43 - 49