Resolution of some 2-stage hybrid flowshop scheduling problems

被引:0
|
作者
Vignier, A
Billaut, JC
Proust, C
TKindt, V
机构
关键词
scheduling; two-stage hybrid flowshop; tardiness;
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper we propose a synthesis of works dealing with a particular two-stage hybrid flow shop. We know its significance for modeling many real manufacturing workshops. There are M((1)) identical machines at the first stage and only one at the second. The optimized criterion is the maximum tardiness. In a first time, machines are always available. Two heuristic resolution methods are given and compared. In a second time one of these methods is particularized when the number of available machines is not lower than M((1)) - 1 at each time. It allows to take a maintenance policy into account. In both cases Linear Programming formulations are given : whereas this approach is not very effective, problems are so accurately explained.
引用
收藏
页码:2934 / 2941
页数:8
相关论文
共 50 条
  • [41] Solving Distributed Hybrid Flowshop Scheduling Problems by a Hybrid Brain Storm Optimization Algorithm
    Hao, Jian-Hua
    Li, Jun-Qing
    Du, Yu
    Song, Mei-Xian
    Duan, Peng
    Zhang, Ying-Yu
    IEEE ACCESS, 2019, 7 : 66879 - 66894
  • [42] SCHEDULING 2-STAGE PROCESSES WITHOUT A BUFFER
    LINSKIY, VS
    KORNEV, MD
    ENGINEERING CYBERNETICS, 1970, (01): : 43 - &
  • [43] Hybrid two stage flowshop scheduling with secondary resources based on time buckets
    Ruiz-Torres, Alex J.
    Paletta, Giuseppe
    Adenso-Diaz, Belarmino
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (06) : 1954 - 1972
  • [44] Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility
    Zhong, Weiya
    Shi, Yun
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2018, 35 (01) : 108 - 125
  • [45] Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility
    Weiya Zhong
    Yun Shi
    Journal of Combinatorial Optimization, 2018, 35 : 108 - 125
  • [46] A two-stage hybrid flowshop scheduling problem in machine breakdown condition
    Mirabi, M.
    Ghomi, S. M. T. Fatemi
    Jolai, F.
    JOURNAL OF INTELLIGENT MANUFACTURING, 2013, 24 (01) : 193 - 199
  • [47] Multi-stage dynamic reentrant hybrid flowshop scheduling with transportation consideration
    Xuan H.
    Li B.
    Wang X.-Y.
    Xu C.-Q.
    Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2018, 35 (03): : 357 - 366
  • [48] A two-stage hybrid flowshop scheduling problem in machine breakdown condition
    M. Mirabi
    S. M. T. Fatemi Ghomi
    F. Jolai
    Journal of Intelligent Manufacturing, 2013, 24 : 193 - 199
  • [49] TWO-STAGE HYBRID FLOWSHOP SCHEDULING PROBLEM WITH INDEPENDENT SETUP TIMES
    Jemmali, M.
    Hidri, L.
    Alourani, A.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2022, 21 (01) : 5 - 16
  • [50] ON SELECTION OF FIRST SAMPLE-SIZE IN SOME 2-STAGE SAMPLING PROBLEMS
    GOLDMAN, A
    ANNALS OF MATHEMATICAL STATISTICS, 1964, 35 (03): : 1392 - &