Allocation of Storage Yards in Management Plans in the Amazon by Means of Mathematical Programming

被引:8
|
作者
da Silva, Evandro Ferreira [1 ]
da Silva, Gilson Fernandes [1 ]
Figueiredo, Evandro Orfano [2 ]
Breda Binoti, Daniel Henrique [1 ]
de Mendonca, Adriano Ribeiro [1 ]
Miquelino Eleto Torres, Carlos Moreira [3 ]
Macedo Pezzopane, Jose Eduardo [1 ]
机构
[1] Fed Univ Espirito Santo UFES, Dept Forest Sci & Wood, Av Governador Lindemberg, BR-29550000 Jeronimo Monteiro, ES, Brazil
[2] Brazilian Agr Res Corp EMBRAPA Acre, BR-364,Km 14, BR-69900970 Rio Branco, AC, Brazil
[3] Fed Univ Vicosa UFV, Dept Forest Engn, BR-36570000 Vicosa, MG, Brazil
关键词
precision forest management; operational research; p-median model; OPTIMIZATION MODEL; LANDING LOCATION; FOREST; IMPACTS; REGENERATION; BIOMASS;
D O I
10.3390/f9030127
中图分类号
S7 [林业];
学科分类号
0829 ; 0907 ;
摘要
The present study aimed to optimize the location of wood storage yards in forest management for the production of wood in the Brazilian Amazon. The area of forest management studied was 638.17 ha, with 1478 trees selected for harvest with a diameter at breast height of at least 50 cm in accordance with Brazilian legislation. Taking the topography into account-permanent preservation areas, restricted areas, and remaining trees-and using GIS tools, 7896 sites were identified that could be used as wood storage yards. By using mathematical programming techniques, more specifically binary integer linear programming, and based on the classical p-median model, optimal locations for the opening of yards were defined. Four scenarios were proposed combining distance and volume constraints. The scenarios evaluated promoted reductions in infrastructure investment compared with traditional planning. The results showed reductions in the number of forest roads (-6.33%) and trails to extract logs (-15.49%) when compared to traditional planning. The best performing scenario was that with the maximum volume restriction. It was concluded that the application of mathematical programming was able to promote significant gains in the harvest planning of native forests of the Amazon with the potential to reduce environmental damage.
引用
收藏
页数:20
相关论文
共 50 条
  • [21] Preprocessing for a map sectorization problem by means of mathematical programming
    Tang, Xin
    Soukhal, Ameur
    T'kindt, Vincent
    ANNALS OF OPERATIONS RESEARCH, 2014, 222 (01) : 551 - 569
  • [22] Fuzzy mathematical programming for portfolio management
    León, T
    Liern, V
    Vercher, E
    FINANCIAL MODELLING, 2000, : 241 - 256
  • [23] Characterization of technical and legal irregularities in management plans in the Brazilian Amazon
    Costa, Vinicius Otavio Benoit
    Koehler, Henrique Soares
    Robert, Renato Cesar Gonsalves
    TREES FORESTS AND PEOPLE, 2024, 16
  • [24] THE QUADRANTS METHOD TO ESTIMATE QUANTITATIVE VARIABLES IN MANAGEMENT PLANS IN THE AMAZON
    Oliveira, Gabriel da Silva
    de Barros Cavalcanti, Francisco Jose
    de Melo, Lucas Amaral
    Monte, Marco Antonio
    CERNE, 2015, 21 (04) : 683 - 691
  • [25] MATHEMATICAL-PROGRAMMING MODEL FOR ALLOCATION OF NATURAL-GAS
    ONEILL, RP
    WILLIARD, M
    WILKINS, B
    PIKE, R
    OPERATIONS RESEARCH, 1979, 27 (05) : 857 - 873
  • [26] Warehouse Design and Product Assignment and Allocation: a mathematical programming model
    Geraldes, Carla A. S.
    Carvalho, Maria Sameiro
    Pereira, Guilherme A. B.
    EUROPEAN SIMULATION AND MODELLING CONFERENCE 2012, 2012, : 314 - +
  • [27] Economic Optimal Allocation of Agriculture Water: Mathematical Programming Approach
    Keramatzadeh, A.
    Chizari, A. H.
    Moore, R.
    JOURNAL OF AGRICULTURAL SCIENCE AND TECHNOLOGY, 2011, 13 (04): : 477 - 490
  • [28] A mathematical approach to optimize crop allocation – A linear programming model
    Bhatia M.
    Rana A.
    International Journal of Design and Nature and Ecodynamics, 2020, 15 (02): : 245 - 252
  • [29] MATHEMATICAL-PROGRAMMING FOR THE SCHEDULING PROBLEM WITH ALTERNATE PROCESS PLANS IN FMS
    JIANG, JC
    HSIAO, WC
    COMPUTERS & INDUSTRIAL ENGINEERING, 1994, 27 (1-4) : 15 - 18
  • [30] MATHEMATICAL-PROGRAMMING AND RESOURCE-MANAGEMENT
    BUCHANAN, JT
    BT TECHNOLOGY JOURNAL, 1995, 13 (01): : 29 - 37