MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints

被引:42
|
作者
Ramezanian, Reza [1 ]
Saidi-Mehrabad, Mohammad [1 ]
Fattahi, Parviz [2 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
[2] Bu Ali Sina Univ, Dept Ind Engn, Hamadan, Iran
关键词
Dynamic lot-sizing and scheduling; Flow shop; Availability constraint; Sequence-dependent setup; Mixed-integer programming; MIP-based heuristic; INTEGRATED PRODUCTION; MACHINE AVAILABILITY; MULTILEVEL; MAKESPAN;
D O I
10.1016/j.jmsy.2013.01.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, the problem of lot-sizing and scheduling of multiple product types in a capacitated flow shop with availability constraints for multi-period planning horizon is considered. In many real production systems, machines may be unavailable due to breakdowns or preventive maintenance activities, thus integrating lot-sizing and scheduling with maintenance planning is necessary to model real manufacturing conditions. Two variants are considered to deal with the maintenance activities. In the first, the starting times of maintenance tasks are fixed, whereas in the second one, maintenance must be carried out in a given time window. A new mixed-integer programming (MIP) model is proposed to formulate the problem with sequence-dependent setups and availability constraints. The objective is to find a production and preventive maintenance schedule that minimizes production, holding and setup costs. Three MIP-based heuristics with rolling horizon framework are developed to generate the integrated plan. Computational experiments are performed on randomly generated instances to show the efficiency of the heuristics. To evaluate the validity of the solution methods, problems with different scales have been studied and the results are compared with the lower bound. Computational experiments demonstrate that the performed methods have good-quality results for the test problems. (C) 2013 The Society of Manufacturing Engineers. Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:392 / 401
页数:10
相关论文
共 50 条
  • [21] The capacitated lot-sizing problem with linked lot sizes
    Suerie, C
    Stadtler, H
    MANAGEMENT SCIENCE, 2003, 49 (08) : 1039 - 1054
  • [22] CAPACITATED LOT-SIZING AND SCHEDULING BY LAGRANGEAN RELAXATION
    DIABY, M
    BAHL, HC
    KARWAN, MH
    ZIONTS, S
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 59 (03) : 444 - 458
  • [23] MIP-based fix-and-optimise algorithms for the parallel machine capacitated lot-sizing and scheduling problem
    Xiao, Jing
    Zhang, Canrong
    Zheng, Li
    Gupta, Jatinder N. D.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (16) : 5011 - 5028
  • [24] The robust multi-plant capacitated lot-sizing problem
    Jalal, Aura
    Alvarez, Aldair
    Alvarez-Cruz, Cesar
    De la Vega, Jonathan
    Moreno, Alfredo
    TOP, 2023, 31 (02) : 302 - 330
  • [25] Progressive interval heuristics for multi-item capacitated lot-sizing problems
    Federgruen, Awi
    Meissner, Joern
    Tzur, Michal
    OPERATIONS RESEARCH, 2007, 55 (03) : 490 - 502
  • [26] A heuristic method for lot-sizing in multi-stage systems
    Franca, PM
    Armentano, VA
    Berretta, RE
    Clark, AR
    COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (09) : 861 - 874
  • [27] THE CAPACITATED MULTIITEM DYNAMIC LOT-SIZING PROBLEM
    BILLINGTON, PJ
    IIE TRANSACTIONS, 1986, 18 (02) : 217 - 219
  • [28] An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times
    Wu, Tao
    Shi, Leyuan
    Song, Jie
    ANNALS OF OPERATIONS RESEARCH, 2012, 196 (01) : 635 - 650
  • [29] An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times
    Tao Wu
    Leyuan Shi
    Jie Song
    Annals of Operations Research, 2012, 196 : 635 - 650
  • [30] A lot-sizing and scheduling model for multi-stage flow lines with zero lead times
    Stadtler, Hartmut
    Sahling, Florian
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 225 (03) : 404 - 419